Portland, Oregon
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Portland.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Portland enforces Oregon specialty codes plus city-specific amendments for seismic resilience, green building, and stormwater management. Cascadia subduction zone exposure places all projects in seismic design category D. Portland's green building policy and unreinforced masonry retrofit requirements add layers beyond state code. CodeBuddy reviews Portland plans for $250 with 24-hour turnaround, addressing seismic, green building, and rain-driven envelope compliance.
Prepared for Acme Mechanical Inc.
Location
Portland, OR
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Portland, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Unreinforced masonry bearing wall retrofit plan missing required steel moment frame insertion per Portland seismic upgrade mandate
Window head flashing omits required kickout diverter at roof-to-wall intersection in Portland's wind-driven rain exposure zone
On-site stormwater facility missing required flow-control device per Portland stormwater management manual standards
Heat pump refrigerant line penetration through exterior wall lacks required rain-sealed escutcheon and vapor barrier tie-in
New commercial tenant space missing required solar-ready zone designation per Portland green building code provisions
Continuous exterior insulation board joints not staggered from sheathing joints reducing thermal break effectiveness
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Portland have building requirements beyond Oregon state code?
Yes. Portland adopts city-specific amendments including green building standards, unreinforced masonry seismic retrofit mandates, enhanced stormwater management requirements, and solar-ready provisions that exceed baseline Oregon specialty code requirements.
What is Portland's unreinforced masonry retrofit requirement?
Portland mandates seismic retrofits for unreinforced masonry buildings to reduce collapse risk from Cascadia subduction zone earthquakes. Property owners must complete structural upgrades on a phased timeline, with engineering plans reviewed for code-compliant retrofit methods.
How does Portland handle stormwater for new development?
Portland requires on-site stormwater management per its stormwater management manual. Projects must include infiltration, detention, or treatment facilities sized for design storm events, with flow-control devices and maintenance access documented on construction plans.
What green building standards does Portland enforce?
Portland's green building policy requires solar-ready roofs, EV-ready parking, enhanced energy performance, and water efficiency measures for qualifying projects. Commercial and larger residential developments face the most comprehensive green building requirements.
How quickly can CodeBuddy review Portland building plans?
CodeBuddy delivers Portland plan reviews within 24 hours for $250. Reviews cover seismic compliance, green building provisions, stormwater requirements, envelope moisture details, and all applicable Oregon specialty code and Portland amendment requirements.
Also in Oregon