Salem, Oregon
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Salem.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Salem enforces Oregon specialty codes as the state capital, with seismic design category D from Cascadia subduction zone exposure and significant Willamette Valley rainfall shaping moisture and drainage requirements. Oregon's energy efficiency code applies with climate zone 4C provisions for heating-dominant design. CodeBuddy reviews Salem plans for $250 with 24-hour turnaround, covering seismic structural design, moisture barriers, and energy code compliance.
Prepared for Acme Mechanical Inc.
Location
Salem, OR
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Salem, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Simpson hold-down anchor bolt edge distance insufficient for seismic design category D uplift forces at braced wall panel
Housewrap installation lacks required shingle-lap integration with window pan flashing in Salem's heavy rain exposure
Furnace combustion air intake positioned below expected flood elevation in Salem's Willamette River floodplain zone
Perimeter foundation drain missing required connection to approved discharge point per Salem stormwater standards
Service entrance conduit weather head height below minimum clearance for Salem's standard overhead utility feed
Garage-to-living space common wall insulation gaps at framing members exceed Oregon energy code thermal bridging limits
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What building codes does Salem enforce as Oregon's capital?
Salem enforces the full suite of Oregon specialty codes including structural, mechanical, plumbing, electrical, and energy efficiency. As the state capital, Salem follows Oregon Building Codes Division standards with no significant local amendments beyond state requirements.
Does Salem have flood zone construction requirements?
Yes. Properties within Salem's Willamette River floodplain must comply with FEMA flood zone regulations and Oregon floodplain development standards. Elevated foundations, flood-resistant materials below base flood elevation, and mechanical equipment placement above flood levels are required.
What moisture protection is required for Salem construction?
Salem's Willamette Valley location receives over 40 inches of annual rainfall. Plans must show compliant weather-resistive barriers, properly integrated window and door flashing, foundation drainage systems, and vapor control appropriate for climate zone 4C.
How do seismic requirements affect Salem building permits?
Salem is in seismic design category D due to Cascadia subduction zone proximity. All structural plans must include engineered lateral force-resisting systems, prescribed hold-down connections, and foundation anchorage per the Oregon Structural Specialty Code.
What does a Salem plan review from CodeBuddy include?
For $250 with 24-hour turnaround, CodeBuddy reviews Salem plans for seismic structural compliance, moisture and drainage details, energy code performance, flood zone requirements, and all applicable Oregon specialty code provisions.
Also in Oregon