Medford, Oregon
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Medford.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Medford enforces Oregon specialty codes in a region with significant wildfire risk and hot, dry summers in the Rogue Valley. Seismic design category D applies from Cascadia subduction zone proximity. Wildfire-interface provisions and enhanced energy cooling loads shape plan review priorities. CodeBuddy reviews Medford plans for $250 with 24-hour turnaround, covering wildfire-resistant construction, seismic design, and energy compliance.
Prepared for Acme Mechanical Inc.
Location
Medford, OR
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Medford, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Deck attachment to structure in wildfire-interface zone lacks required noncombustible flashing at ledger connection
Cripple wall bracing below first floor does not meet seismic design category D requirements for Medford site class
Cooling system capacity undersized for Medford's Rogue Valley peak summer temperatures exceeding 100 degrees Fahrenheit
Attic radiant barrier omitted from south-facing roof assembly where required by Oregon energy code cooling provisions
Exterior meter panel clearance encroached by combustible vegetation within wildfire hazard overlay zone setback
Irrigation backflow preventer installed below grade without required freeze protection for Medford's winter low temperatures
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Medford require wildfire-resistant construction?
Yes. Properties in Medford's wildfire hazard overlay zones must use ignition-resistant materials, Class A roofing, screened attic vents, and noncombustible decking attachments. The Rogue Valley's dry summers and fire history make these provisions a priority during plan review.
What cooling load considerations apply to Medford projects?
Medford experiences peak summer temperatures regularly exceeding 100 degrees. Mechanical plans must demonstrate adequate cooling capacity, and energy code compliance requires proper solar heat gain control, insulation, and window specifications for the cooling season.
What seismic requirements affect building in Medford?
Medford falls under seismic design category D due to Cascadia subduction zone proximity. Structural plans must include engineered lateral systems, foundation anchorage, and cripple wall bracing per the Oregon Structural Specialty Code.
How does Medford handle energy code compliance?
Medford follows the Oregon Energy Efficiency Specialty Code for its climate zone. The hot-dry summer climate emphasizes cooling efficiency, solar heat gain coefficients, and attic insulation values alongside standard heating season envelope requirements.
Can CodeBuddy review my Medford building plans?
CodeBuddy reviews Medford plans for $250 with 24-hour turnaround. Reviews cover wildfire-interface compliance, seismic structural design, energy code, and mechanical sizing against Oregon specialty codes and Medford-specific overlay zone requirements.
Also in Oregon