Energy & Utilities · Portland, Oregon
Energy & Utilities inspection readiness
for Portland.
Send us photos of your energy & utilities work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Substations, switchgear, utility poles, arc flash, NESC, and OSHA 1910.269 compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your energy & utilities work in Portland, Oregon against the codes and specs that apply. Send photos of substations, switchgear, utility poles, arc flash, nesc, and osha 1910 and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about energy & utilities inspections in Portland
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
utility inspection preparation in Portland?
substation inspection checklist in Portland?
energy facility inspection requirements in Portland?
NESC inspection prep in Portland?
arc flash inspection requirements in Portland?
Three steps. Five minutes.
Submit your energy & utilities job, and our patent-pending AI reviews every photo against the standards that apply in Portland.
Tell us about your energy & utilities job.
Project name, address in Portland, and scope. We look up the applicable standards automatically.
Send photos of your energy & utilities work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging energy & utilities deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Energy & Utilities findings we help catch in Portland.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Window head flashing omits required kickout diverter at roof-to-wall intersection in Portland's wind-driven rain exposure zone
On-site stormwater facility missing required flow-control device per Portland stormwater management manual standards
Heat pump refrigerant line penetration through exterior wall lacks required rain-sealed escutcheon and vapor barrier tie-in
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR ENERGY & UTILITIES REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.