Eugene, Oregon

Find what your
punch list missed.

Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.

— any industry with field inspections in Eugene.

$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.

Eugene applies Oregon specialty codes with strong green building incentives and rain-driven moisture management requirements in the Willamette Valley. Seismic design category D applies due to Cascadia subduction zone exposure. Eugene promotes energy-efficient and sustainable construction beyond state minimums. CodeBuddy reviews Eugene plans for $250 with 24-hour turnaround, addressing moisture control, seismic detailing, and green building provisions.

Trusted by teams at

Layton ConstructionBell ConstructionIPSPraetorian Power

Three steps. Five minutes.

Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.

1

Tell us about the job.

Project name, address in Eugene, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.

Applicable standards pulled automatically from the project address
Upload your own specs or submittals for even tighter checking
2

Send your photos and open items.

Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.

Photos encrypted in transit and at rest — never shared or sold
3

Our patent-pending technology and AI system analyze every photo.

Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.

Hundreds of inspections completed across all major trades
Every finding is reviewed by a QA professional before delivery
4

Get your report within 24 hours*.

Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.

24-hour turnaround (business days)
Nothing new found? You pay $0 and keep the report

Built by Code Buddy.

Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.

Built for the people who actually do the work.

17+

Industries supported

24 hrs*

Report turnaround

$0

If nothing new identified

The kind of things we help catch.

Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.

building_envelope·critical

Rain screen gap behind cladding missing on west-facing wall, required in Eugene's high-rainfall Willamette Valley exposure

structural·critical

Shear wall nailing schedule insufficient for seismic design category D lateral loads per Oregon Structural Specialty Code

mechanical·major

ERV unit lacks required drain pan and condensate line for Eugene's humid heating season ventilation loads

plumbing·major

Foundation drain system missing required filter fabric wrap to prevent silt clogging in Willamette Valley clay soils

electrical·minor

EV-ready conduit stub not provided in garage per Eugene green building program requirements for new homes

insulation·minor

Crawl space vapor barrier seams lack required 6-inch overlap and tape sealing for moisture-prone valley site

Only $250, one time.

And only if we identify something that wasn't already on your list.

If everything identified was already on your list, you pay nothing. You keep the report either way.

GET STARTED

Limited spots each week.

Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.

Before you ask.

What moisture protection does Eugene require for exterior walls?

Eugene enforces Oregon's weather-resistive barrier requirements with particular attention to rain screen details on the rain-exposed west side. Continuous drainage planes, flashed window openings, and ventilated cladding gaps are standard review items.

Does Eugene have green building requirements beyond Oregon state code?

Eugene encourages sustainable construction through its green building program, which may require EV-ready wiring, solar-ready roof zones, and enhanced energy performance. Specific incentives apply to projects exceeding baseline Oregon Energy Efficiency Specialty Code standards.

What seismic design category applies in Eugene?

Eugene is classified as seismic design category D under the Oregon Structural Specialty Code. All structures must incorporate compliant lateral force-resisting systems, proper anchorage, and engineered connections to address Cascadia subduction zone risk.

How does Eugene handle stormwater for new construction?

Eugene requires on-site stormwater management plans for new development, including low-impact development techniques. Pervious surfaces, bioswales, and detention systems are commonly required to manage Willamette Valley rainfall volumes.

What does a $250 CodeBuddy review cover for Eugene projects?

For $250 with 24-hour turnaround, CodeBuddy reviews Eugene plans against Oregon specialty codes, checking structural seismic compliance, moisture management, energy code, and any Eugene-specific green building or stormwater provisions.

One job in Eugene. Report within 24 hours*.
Nothing new, no charge.