Provo, Utah

Find what your
punch list missed.

Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.

— any industry with field inspections in Provo.

$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.

Provo lies in Seismic Design Category D on the Wasatch Front with ground snow loads reaching 45 psf in foothills east of BYU campus. Rapid residential growth drives high permit volume under Utah-amended IBC and IRC. Energy code compliance for Climate Zone 5B demands continuous insulation and efficient HVAC. CodeBuddy reviews Provo plans for $250 with 24-hour turnaround, catching seismic and envelope issues early.

Trusted by teams at

Layton ConstructionBell ConstructionIPSPraetorian Power

Three steps. Five minutes.

Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.

1

Tell us about the job.

Project name, address in Provo, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.

Applicable standards pulled automatically from the project address
Upload your own specs or submittals for even tighter checking
2

Send your photos and open items.

Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.

Photos encrypted in transit and at rest — never shared or sold
3

Our patent-pending technology and AI system analyze every photo.

Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.

Hundreds of inspections completed across all major trades
Every finding is reviewed by a QA professional before delivery
4

Get your report within 24 hours*.

Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.

24-hour turnaround (business days)
Nothing new found? You pay $0 and keep the report

Built by Code Buddy.

Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.

Built for the people who actually do the work.

17+

Industries supported

24 hrs*

Report turnaround

$0

If nothing new identified

The kind of things we help catch.

Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.

structural·critical

Cripple wall bracing below first floor missing in hillside dwelling within Provo Seismic Design Category D zone

structural·major

Deck ledger connection lacks lag bolt spacing required for snow drift accumulation against two-story east-facing wall

energy·major

Duct system in unconditioned attic not insulated to R-8 minimum required under Utah-adopted IECC for Climate Zone 5B

mechanical·critical

Gas fireplace direct vent termination clearance to operable bedroom window less than required 4 feet

plumbing·minor

Water heater expansion tank missing on closed-loop system served by Provo municipal water supply

electrical·minor

Outdoor receptacle on rear patio lacks in-use weatherproof cover rated for wet locations

Only $250, one time.

And only if we identify something that wasn't already on your list.

If everything identified was already on your list, you pay nothing. You keep the report either way.

GET STARTED

Limited spots each week.

Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.

Before you ask.

What seismic requirements apply to residential construction in Provo?

Provo is classified as Seismic Design Category D due to its location along the Wasatch Fault. Residential projects require engineered shear walls, hold-down hardware, and reinforced concrete foundations per Utah-amended IRC Chapter 6.

Does Provo have local building code amendments beyond Utah state codes?

Provo generally follows the state-adopted IBC and IRC with Utah amendments. The city may impose additional requirements for hillside development, wildland-urban interface areas, and stormwater management on new construction.

What is the ground snow load for Provo building design?

Provo ground snow loads typically range from 30 psf in the valley floor to 45 psf or more in the east bench foothills. Higher elevations near Rock Canyon and Squaw Peak require site-specific snow load analysis.

How much does a CodeBuddy plan review cost for a Provo project?

A CodeBuddy plan review costs $250 with results delivered within 24 hours. The review checks structural, mechanical, plumbing, electrical, and energy code compliance against current Provo and Utah requirements.

Are there special energy code requirements in Provo?

Provo falls in IECC Climate Zone 5B, requiring R-49 ceiling insulation, R-20 continuous wall insulation, and U-0.30 windows. Blower door testing to 3 ACH50 is also required for new residential construction.

One job in Provo. Report within 24 hours*.
Nothing new, no charge.