Ogden, Utah

Find what your
punch list missed.

Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.

— any industry with field inspections in Ogden.

$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.

Ogden sits in Seismic Design Category D along the Wasatch Front and receives heavy snow loads exceeding 40 psf at higher elevations. The city enforces Utah-amended IBC and IRC with strict lateral bracing and energy code requirements for its cold, dry climate. CodeBuddy reviews Ogden plans for $250 with 24-hour turnaround, flagging seismic detailing, snow drift loads, and insulation deficiencies before permit submission.

Trusted by teams at

Layton ConstructionBell ConstructionIPSPraetorian Power

Three steps. Five minutes.

Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.

1

Tell us about the job.

Project name, address in Ogden, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.

Applicable standards pulled automatically from the project address
Upload your own specs or submittals for even tighter checking
2

Send your photos and open items.

Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.

Photos encrypted in transit and at rest — never shared or sold
3

Our patent-pending technology and AI system analyze every photo.

Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.

Hundreds of inspections completed across all major trades
Every finding is reviewed by a QA professional before delivery
4

Get your report within 24 hours*.

Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.

24-hour turnaround (business days)
Nothing new found? You pay $0 and keep the report

Built by Code Buddy.

Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.

Built for the people who actually do the work.

17+

Industries supported

24 hrs*

Report turnaround

$0

If nothing new identified

The kind of things we help catch.

Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.

structural·critical

Hold-down anchors at shear wall ends undersized for Seismic Design Category D forces along the Wasatch Fault zone

structural·critical

Roof framing not designed for 50 psf ground snow load required at Ogden bench elevations above 4,500 feet

mechanical·major

Furnace combustion air intake located below expected snow drift depth on north-facing wall

energy·major

Above-grade wall insulation specified at R-19 instead of R-20 continuous required for Climate Zone 5B

plumbing·minor

Exterior hose bibb supply line lacks freeze protection required for Ogden winter design temperature of 5 degrees F

electrical·minor

Panel schedule missing arc-fault circuit interrupter designation for bedroom branch circuits

Only $250, one time.

And only if we identify something that wasn't already on your list.

If everything identified was already on your list, you pay nothing. You keep the report either way.

GET STARTED

Limited spots each week.

Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.

Before you ask.

What building codes does Ogden currently enforce?

Ogden enforces the International Building Code and International Residential Code as amended by the State of Utah. Local amendments may add requirements for hillside grading and snow load design in bench areas above the city center.

How does the Wasatch Front seismic zone affect my Ogden project?

Ogden falls in Seismic Design Category D due to its proximity to the Wasatch Fault. This requires engineered hold-downs, Simpson connectors at shear walls, and foundation reinforcement beyond what non-seismic areas need.

What snow load should I design for in Ogden?

Ground snow loads in Ogden range from 30 to 50 psf depending on elevation. Properties on the east bench near the mountains require higher values. A site-specific analysis may be needed for steep or exposed lots.

How fast does CodeBuddy return a plan review for Ogden permits?

CodeBuddy delivers a full code compliance review within 24 hours for $250. The report covers structural, mechanical, electrical, plumbing, and energy code items specific to Ogden requirements and Utah state amendments.

Does Ogden require energy code compliance documentation?

Yes. Ogden requires compliance with the IECC as adopted by Utah. Projects must show envelope insulation values, window U-factors, and mechanical efficiency ratings that meet Climate Zone 5B minimums on submitted plans.

One job in Ogden. Report within 24 hours*.
Nothing new, no charge.