Allentown, Pennsylvania
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Allentown.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Allentown follows the PA Uniform Construction Code enforced through its Building Department and approved third-party agencies. The Lehigh Valley's mix of warehouse conversions, former steel-era buildings, and new distribution centers creates distinct inspection challenges. Code Buddy's Inspection Readiness Report costs $250 with 24-hour turnaround, flagging issues like floodplain compliance near the Lehigh River and frost-depth footing requirements before your inspector arrives.
Prepared for Acme Mechanical Inc.
Location
Allentown, PA
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Allentown, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Warehouse-to-residential conversion missing required fire separation between occupancy types per IBC Table 508.4
Radon mitigation passive stack not extended through roof per PA Act 43 requirements in Lehigh County zone 1 area
Distribution center loading dock lighting circuits lack GFCI protection within 6 feet of overhead door openings
Ductwork insulation in unconditioned warehouse space below R-8 minimum for Allentown climate zone 5 heating loads
Footing depth at 30 inches does not meet 36-inch frost line requirement for Lehigh Valley freeze-thaw conditions
Sprinkler head spacing in high-piled storage area exceeds maximum 100 sq ft coverage per NFPA 13 Chapter 16
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Allentown require third-party inspections for commercial projects?
Yes. Under PA UCC, Allentown permits the use of approved third-party inspection agencies for commercial and certain residential projects. The building department maintains a list of accepted agencies, and the property owner selects and contracts with the agency directly.
What flood zone requirements apply near the Lehigh River in Allentown?
Properties in Allentown's FEMA-designated flood zones along the Lehigh River must elevate the lowest floor above base flood elevation. Mechanical equipment, ductwork, and electrical panels must also be elevated or flood-proofed per local floodplain ordinance requirements.
How does the Inspection Readiness Report handle PA UCC code cycles?
The report checks your plans against the current PA UCC adoption, which is based on the 2018 IBC and IRC with Pennsylvania amendments. When the state updates its code cycle, the report automatically reflects the new requirements within the $250 flat fee.
Are radon mitigation systems required for new construction in Allentown?
Lehigh County is designated EPA Radon Zone 1, meaning new residential construction must include radon-resistant techniques per PA Act 43. This includes a gas-permeable layer, vapor barrier, sealed vent pipe, and junction box for a future fan.
What is the turnaround time for a readiness report on a warehouse conversion project?
All reports are delivered within 24 hours regardless of project type. Warehouse and adaptive reuse projects in the Lehigh Valley receive additional checks for mixed-occupancy separation, structural load changes, and accessibility upgrades required under change-of-use provisions.
Also in Pennsylvania