Oklahoma City, Oklahoma
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Oklahoma City.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Oklahoma City contractors can get a written Inspection Readiness Report for $250, delivered within 24 hours. The report covers code compliance findings based on your photos and tracking list, addressing common issues in the metro area including tornado-hardened construction requirements, energy sector facility standards, and wind uplift provisions near Tinker Air Force Base.
Prepared for Acme Mechanical Inc.
Location
Oklahoma City, OK
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Oklahoma City, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof-to-wall hurricane clips missing on gable end trusses, required in Oklahoma City wind zone for uplift resistance
Service panel bonding jumper not installed, neutral and ground buses sharing termination bar without proper separation
HVAC condensate drain lacks secondary overflow pan in attic installation above finished ceiling space
Water heater seismic strapping not installed per Oklahoma City amendment requiring restraint in garage installations
Load-bearing header undersized at 4-foot garage door opening, engineered lumber specification not matching approved plans
Attic insulation compressed at eave baffles reducing R-value below R-38 minimum for Oklahoma climate zone 3A
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What does the Oklahoma City Inspection Readiness Report include?
The report lists specific code violations and compliance gaps found in your submitted photos, cross-referenced against Oklahoma City adopted codes including local amendments for wind resistance and tornado shelter provisions.
How does the $250 report help before my Oklahoma City inspection?
You receive a detailed findings list within 24 hours, giving you time to correct violations before the inspector arrives. This reduces failed inspections and avoids costly re-inspection fees and project delays.
What types of projects does the report cover?
The report covers residential and commercial construction including new builds, renovations, and tenant improvements. It addresses structural, electrical, mechanical, plumbing, and energy code compliance for permitted work.
Do I need to submit all my project photos at once?
You can submit photos in batches organized by trade or inspection stage. Include clear shots of connections, labels, and installations. The more complete your photo set, the more thorough the findings report.
Are tornado shelter requirements covered in the report?
Yes. Oklahoma City requires storm shelters or safe rooms in new residential construction. The report checks shelter door ratings, anchor bolt spacing, ventilation, and compliance with ICC 500 standards.
Also in Oklahoma