Broken Arrow, Oklahoma
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Broken Arrow.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Broken Arrow contractors can order an Inspection Readiness Report for $250 with 24-hour turnaround. The report identifies code compliance issues from your project photos before the inspector arrives, addressing the rapid residential growth in this Tulsa suburb where new subdivision construction and tornado-resistant building requirements demand careful attention to local code amendments.
Prepared for Acme Mechanical Inc.
Location
Broken Arrow, OK
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Broken Arrow, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Tornado safe room anchor bolts spaced at 8 inches instead of required 6 inches per Broken Arrow residential storm shelter ordinance
AFCI protection missing on bedroom branch circuits, required for all 15- and 20-amp dwelling unit circuits
Rim board not sealed at foundation sill plate, leaving gap visible for termite and moisture intrusion in new subdivision lot
Ductwork joints in unconditioned attic not sealed with mastic, exceeding allowable leakage rate for Broken Arrow energy code
Backflow preventer not installed on irrigation tap connection at meter, required for all new residential landscape systems
Garage-to-living-space firewall insulation cut short at top plate, leaving 3-inch gap in fire separation assembly
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What does the Broken Arrow Inspection Readiness Report cover?
The report reviews your submitted photos against Broken Arrow adopted building codes and local amendments, identifying violations in structural, electrical, mechanical, plumbing, and energy systems before your scheduled inspection.
How fast do I get results after submitting photos?
You receive your written findings report within 24 hours of photo submission. The $250 flat fee covers a complete review of one inspection stage with detailed findings and code references.
Does the report address Broken Arrow tornado shelter requirements?
Yes. Broken Arrow requires storm shelters in new residential construction. The report verifies anchor bolt patterns, door ratings, ventilation openings, and structural connections per the city's adopted safe room standards.
Can the report help with new subdivision inspections?
Absolutely. With rapid residential growth in Broken Arrow, the report catches common new-construction issues like missing fire blocking, improperly graded lots, and incomplete energy code compliance that frequently cause failed inspections.
What photos should I submit for the best results?
Submit clear photos of all framing connections, electrical panels, plumbing rough-in, mechanical installations, and insulation coverage. Include wide shots showing overall layout and close-ups of specific connections and labels.
Also in Oklahoma