Norman, Oklahoma
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Norman.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Norman contractors can order an Inspection Readiness Report for $250 with 24-hour delivery. The report reviews your project photos for code violations before the official inspection. Located at the epicenter of tornado alley and home to the National Weather Center, Norman enforces strict wind-resistant construction standards and storm shelter requirements that demand careful compliance verification.
Prepared for Acme Mechanical Inc.
Location
Norman, OK
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Norman, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Continuous load path connections missing from foundation to roof, required in Norman for tornado alley wind uplift resistance per local amendment
Whole-house surge protector not installed at main panel, required by Norman amendment for lightning-prone central Oklahoma storm exposure
Rooftop HVAC unit not secured with seismic-rated curb adapter, unit vulnerable to displacement during high-wind events in Norman
Underground sewer lateral backwater valve missing at property line cleanout, required to prevent storm surge backup in Norman flood-prone areas
Roof sheathing nailed with 6d nails at 12-inch spacing instead of 8d nails at 6-inch spacing required for wind zone
Spray foam insulation applied over electrical junction boxes in attic, blocking required access to covered splices and connections
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What does the Norman Inspection Readiness Report include?
The report provides written findings from your submitted project photos, checked against Norman's adopted building codes and local tornado-resistance amendments. Each finding cites the specific code section and describes the corrective action needed.
Does the report cover Norman's storm shelter requirements?
Yes. Norman requires FEMA-rated safe rooms or ICC 500 compliant storm shelters in new residential construction. The report verifies wall reinforcement, door impact ratings, anchor bolt patterns, and ventilation per Norman's adopted standards.
How quickly do I receive the report?
You receive the written findings report within 24 hours of submitting your photos and tracking list. The $250 flat fee covers one complete inspection stage review with detailed findings and code references.
Are wind-resistance details covered for Norman construction?
Yes. Norman sits in tornado alley and requires continuous load path connections, enhanced roof-to-wall strapping, and specific sheathing fastener patterns. The report checks all wind-resistance provisions against current adopted standards.
Can I use this report for OU campus area projects?
Yes. The report covers residential and commercial projects throughout Norman, including renovations and new construction near the University of Oklahoma campus. It addresses all trades and local code requirements regardless of project location.
Also in Oklahoma