Edmond, Oklahoma
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Edmond.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Edmond contractors can get a written Inspection Readiness Report for $250, delivered within 24 hours. The report identifies code violations from your project photos before the official inspection, covering Edmond's tornado shelter requirements, residential growth near the University of Central Oklahoma campus, and the city's adopted amendments to the International Building Code.
Prepared for Acme Mechanical Inc.
Location
Edmond, OK
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Edmond, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Storm shelter concrete wall thickness measures 4 inches instead of minimum 6 inches required by Edmond tornado shelter ordinance
Tamper-resistant receptacles not installed in student housing common areas, required within 5.5 feet of floor in Edmond dwelling units
Furnace combustion air opening undersized for 80,000 BTU unit in enclosed utility closet, insufficient ventilation clearance
Gas water heater in garage not elevated 18 inches above floor per ignition source height requirement for Edmond residential garages
Simpson Strong-Tie connectors at hip roof corners installed with pneumatic nails instead of specified structural screws per engineering
Exterior wall cavity insulation missing vapor retarder facing on north elevation, allowing moisture migration in Oklahoma climate zone
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What is included in the Edmond Inspection Readiness Report?
The report provides a written list of code violations identified from your photos, referenced against Edmond's adopted codes and local amendments. It covers structural, electrical, mechanical, plumbing, and energy compliance for your permitted project.
Does the report check Edmond's tornado shelter requirements?
Yes. Edmond mandates storm shelters or safe rooms in new residential construction. The report reviews wall thickness, reinforcement spacing, door ratings, anchor details, and ventilation per the city's adopted ICC 500 standards.
How does the $250 report save me money?
A failed inspection in Edmond means re-inspection fees, subcontractor return trips, and project delays. The report catches common violations before the inspector arrives, letting you correct issues on your schedule instead of after a failed inspection.
Can I use this for remodel projects near UCO campus?
Yes. The report covers renovation and adaptive reuse projects including structural modifications, electrical upgrades, and fire separation requirements common in Edmond residential conversions and multi-family renovations.
What trades does the report review?
The report covers all major trades: structural and framing, electrical, mechanical and HVAC, plumbing, insulation and energy code, and fire protection. Each finding includes the specific code section violated and recommended corrective action.
Also in Oklahoma