Grand Rapids, Michigan
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Grand Rapids.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Grand Rapids Inspection Readiness Report is a $250 one-time service with 24-hour turnaround. Submit jobsite photos and your tracking list to receive findings before the inspector arrives. Grand Rapids sits on the west side of Michigan where lake-effect snow from Lake Michigan drives strict enforcement of roof snow load requirements, ice-and-water shield installation, and frost-depth footings.
Prepared for Acme Mechanical Inc.
Location
Grand Rapids, MI
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Grand Rapids, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof truss design not rated for Grand Rapids lake-effect snow load of 30 psf ground snow
Ice-and-water shield membrane not extended 24 inches past interior wall line at eave overhang
Arc-fault circuit interrupter protection not provided for bedroom branch circuits as required
Exterior hose bibb missing integral backflow preventer and freeze-proof stem length
Exhaust vent for bathroom fan terminated in soffit instead of through roof per Michigan code
Fire-rated assembly penetration at plumbing chase not sealed with approved firestop material
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What snow load does Grand Rapids require for roof design?
Grand Rapids requires a minimum 30 psf ground snow load for structural roof design due to lake-effect snowfall from Lake Michigan. Truss and rafter designs must be engineered for this load, and inspectors verify documentation at framing inspection.
Does Grand Rapids enforce ice-and-water shield requirements beyond state code?
Grand Rapids follows Michigan Building Code requirements for ice-and-water shield, which mandate coverage from the eave edge to at least 24 inches past the interior wall line. Lake-effect conditions make this a frequent inspection checkpoint.
How does the $250 readiness report help with Grand Rapids inspections?
You submit photos and your tracking list, and within 24 hours receive a report identifying likely findings. This lets you correct issues before the Grand Rapids inspector visits, avoiding re-inspection fees and scheduling delays.
What are the most common Grand Rapids inspection failures?
Frequent failures include insufficient ice-and-water shield coverage, missing AFCI protection on bedroom circuits, bathroom exhaust venting into attic or soffit spaces, and incomplete firestopping at rated assembly penetrations.
What is the frost depth for footings in Grand Rapids?
Grand Rapids requires footings at a minimum 42-inch depth below grade to extend below the frost line. Inspectors verify footing depth at the foundation inspection stage before concrete placement is approved.
Also in Michigan