Detroit, Michigan
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Detroit.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Detroit Inspection Readiness Report costs $250 one-time with 24-hour turnaround. Submit your jobsite photos and tracking list to receive findings before the inspector does. Detroit's blight remediation program and legacy industrial sites create unique inspection conditions, and the city enforces Michigan Building Code with additional requirements for occupied structures in redevelopment zones.
Prepared for Acme Mechanical Inc.
Location
Detroit, MI
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Detroit, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Service entrance cable rating insufficient for upgraded panel in blight remediation rehab project
Lead service line not replaced at property connection per Detroit water supply compliance requirements
Load-bearing wall header undersized at window opening in historic Detroit duplex renovation
Ductwork in unheated garage not insulated to minimum R-8 for Michigan energy code compliance
Vapor barrier on crawlspace floor not lapped and sealed at foundation wall perimeter
Carbon monoxide detector not installed within 10 feet of sleeping room in multi-family conversion
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What extra requirements apply to Detroit blight remediation projects?
Detroit blight remediation projects must meet current Michigan Building Code for all renovated systems regardless of original construction date. Electrical, plumbing, and structural work must be brought to current standards, not grandfathered.
Does Detroit require lead water line replacement during renovation?
Detroit requires lead service line assessment during major plumbing renovations. If a lead line is found, replacement is mandatory at the property connection. The city coordinates with the water department on street-side replacement.
How does the $250 readiness report work for Detroit projects?
You submit jobsite photos and your inspection tracking list. Within 24 hours, you receive a report identifying probable findings. This helps avoid failed inspections and costly re-inspection delays in a city with limited scheduling availability.
What are common Detroit inspection failures on rehab projects?
Common failures include undersized electrical services for modern loads, missing fire separation in multi-family conversions, inadequate structural headers at modified openings, and non-compliant egress windows in basement bedrooms.
Can I use the readiness report for Detroit rental registration inspections?
Yes. The report reviews your property against the same code standards Detroit rental inspectors check. It covers smoke and CO detectors, egress, electrical safety, and structural integrity items common in rental compliance inspections.
Also in Michigan