Flint, Michigan
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Flint.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Flint Inspection Readiness Report is a $250 one-time service with 24-hour turnaround. You send jobsite photos and your tracking list, and receive a findings report before the inspector arrives. Flint enforces Michigan Building Code with heightened scrutiny on plumbing materials and water line connections due to the city's documented lead and copper water infrastructure concerns.
Prepared for Acme Mechanical Inc.
Location
Flint, MI
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Flint, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Copper water supply lines not verified lead-free at solder joints per Flint plumbing requirements
Aluminum branch circuit wiring connections missing approved anti-oxidant compound and rated connectors
Frost-damaged foundation block wall showing horizontal cracking at grade from freeze-thaw heaving
High-efficiency furnace condensate drain not routed to approved discharge point before freezing exposure
Exterior wall sheathing moisture barrier not lapped correctly over flashing at window sill
Hardwired smoke detectors not installed in every bedroom per current Michigan Residential Code
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Flint have special plumbing inspection requirements related to water quality?
Yes. Flint inspectors verify that all water supply piping uses lead-free materials and approved solder. Copper lines must be confirmed lead-free at joints, and service line material documentation is required for permit closeout.
What does the $250 Flint readiness report cover?
The report reviews your submitted jobsite photos against Michigan Building Code and Flint-specific enforcement items. It identifies probable findings across electrical, plumbing, mechanical, structural, and building trades within 24 hours.
Are there common foundation issues Flint inspectors look for?
Flint sits in a zone with significant freeze-thaw cycling. Inspectors look for horizontal cracking in block foundations, step cracks at frost lines, and water infiltration signs. Footing depth must meet the 42-inch frost line requirement.
How do I schedule an inspection with the Flint Building Department?
Flint accepts inspection requests by phone. Availability can be limited, so a failed inspection means significant delays. The readiness report helps identify issues before your scheduled date to reduce re-inspection risk.
Does the readiness report replace the official Flint inspection?
No. The Inspection Readiness Report is a pre-inspection review only. It flags likely findings so you can correct them before the Flint Building Department conducts the official inspection required for permit closeout.
Also in Michigan