Charleston, West Virginia
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Charleston.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Charleston enforces the West Virginia State Building Code based on the IBC and IRC. Code Buddy's Inspection Readiness Report for Charleston costs $250 with 24-hour turnaround. The Kanawha Valley's chemical industry corridor, steep hillside building sites, and Kanawha River flood exposure create inspection challenges around foundation engineering on slopes, vapor intrusion mitigation, and flood-resistant construction below base flood elevation.
Prepared for Acme Mechanical Inc.
Location
Charleston, WV
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Charleston, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Hillside foundation on Charleston's South Hills lacks required engineered retaining wall design for slope exceeding 30 percent grade
Service panel in Kanawha River flood zone installed below base flood elevation without required waterproof disconnect above BFE
Radon mitigation system passive pipe not extended through roof as required, terminated in attic space with no active fan provision
Chemical corridor property sewer lateral missing required backflow preventer and explosion-proof cleanout cap near industrial neighbor
Government district office renovation exceeds 12,000 square feet without required automatic sprinkler system throughout
Crawlspace vapor barrier not sealed at piers and foundation walls, allowing ground moisture migration into floor assembly
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What building codes does Charleston, West Virginia enforce?
Charleston enforces the West Virginia State Building Code, which adopts the International Building Code, International Residential Code, and associated mechanical and plumbing codes with state amendments addressing regional conditions like mine subsidence and flood zones.
How much does an Inspection Readiness Report cost for a Charleston project?
The report costs $250 per project with 24-hour delivery. It reviews plans against current Charleston enforcement practices including hillside construction, Kanawha River flood zone requirements, and radon mitigation standards.
Does Charleston require radon mitigation in new construction?
West Virginia's radon risk zones apply to Charleston. New residential construction typically requires at minimum a passive radon rough-in pipe from below the slab through the roof, with provisions for adding an active fan if post-construction testing shows elevated levels.
How do steep building sites affect inspections in Charleston?
Hillside lots common in Charleston's South Hills and Kanawha City require engineered foundation plans. Inspectors verify retaining wall design, proper drainage behind walls, and erosion control measures before approving footing and foundation inspections.
Are there special requirements near Charleston's chemical industry corridor?
Properties near the Kanawha Valley chemical facilities may require vapor intrusion assessments. Inspectors also verify enhanced sewer backflow prevention and may require explosion-proof fixtures in areas with documented environmental exposure risks.
Also in West Virginia