General Construction · Charleston, West Virginia
General Construction inspection readiness
for Charleston.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Charleston, West Virginia against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Charleston
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Charleston?
construction inspection checklist in Charleston?
what do building inspectors look for in Charleston?
framing inspection prep in Charleston?
final inspection checklist construction in Charleston?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Charleston.
Tell us about your general construction job.
Project name, address in Charleston, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Charleston.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Hillside foundation on Charleston's South Hills lacks required engineered retaining wall design for slope exceeding 30 percent grade
Service panel in Kanawha River flood zone installed below base flood elevation without required waterproof disconnect above BFE
Radon mitigation system passive pipe not extended through roof as required, terminated in attic space with no active fan provision
Chemical corridor property sewer lateral missing required backflow preventer and explosion-proof cleanout cap near industrial neighbor
Government district office renovation exceeds 12,000 square feet without required automatic sprinkler system throughout
Crawlspace vapor barrier not sealed at piers and foundation walls, allowing ground moisture migration into floor assembly
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.