Morgantown, West Virginia
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Morgantown.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Morgantown enforces the West Virginia State Building Code based on the IBC and IRC. Code Buddy's Inspection Readiness Report for Morgantown costs $250 with 24-hour delivery. The city's hilly terrain along the Monongahela River, rapid growth driven by West Virginia University, and expanding student housing market create inspection priorities around hillside grading, stormwater management on sloped lots, and life-safety compliance in high-occupancy rental conversions.
Prepared for Acme Mechanical Inc.
Location
Morgantown, WV
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Morgantown, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Student housing addition on steep Morgantown hillside lacks engineered pier foundation design for slope exceeding 25 percent grade
Monongahela River area basement apartment has sewage pump without required battery backup, risking backup during frequent valley storms
WVU-area rental conversion exceeds dwelling unit load calculation on existing 100-amp service without required panel upgrade to 200 amps
New construction passive radon pipe terminates below roofline near operable bedroom window instead of required 10 feet above grade
Five-bedroom student rental converted from single-family lacks required interconnected hardwired smoke detectors with battery backup in each room
Slab-on-grade on north-facing Morgantown slope missing required R-10 perimeter insulation extending 24 inches below grade
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What building codes apply in Morgantown?
Morgantown enforces the West Virginia State Building Code, adopting the International Building Code and International Residential Code with state amendments. The city's building department also applies local stormwater and grading ordinances for the hilly terrain.
How much does a Morgantown Inspection Readiness Report cost?
The report is $250 per project with 24-hour turnaround. It covers Morgantown-specific issues including hillside foundation requirements, student housing life-safety compliance, radon rough-in standards, and stormwater management on sloped building sites.
Does Morgantown require radon mitigation systems?
West Virginia's radon risk classification applies to Morgantown. New residential construction requires at minimum a passive radon pipe from the sub-slab through the roof, properly terminated above the roofline and away from any operable windows or air intakes.
What are common issues with student housing conversions in Morgantown?
Inspectors frequently cite insufficient electrical service capacity for added bedrooms, missing interconnected hardwired smoke and CO detectors, inadequate egress windows in basement sleeping rooms, and lack of fire separation between converted dwelling units.
How does Morgantown's terrain affect construction inspections?
The steep hills around the Monongahela River valley mean most sites require engineered grading plans, retaining wall designs, and stormwater detention calculations. Inspectors verify erosion control measures are in place before approving footing excavations on sloped lots.
Also in West Virginia