Spokane, Washington
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Spokane.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Spokane enforces the Washington State Building Code adapted for eastern Washington's drier continental climate, with heavy snow loads, freeze-thaw cycling, and Seismic Design Category C considerations. Unlike the wet west side, Spokane's construction challenges center on frost depth footings, ice dam prevention, and extreme temperature swings. CodeBuddy reviews your Spokane plans for $250 with 24-hour turnaround, covering structural snow loads and energy code compliance.
Prepared for Acme Mechanical Inc.
Location
Spokane, WA
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Spokane, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof truss design uses 25 psf ground snow load but Spokane requires minimum 32 psf per local snow load data
Foundation footing depth set at 24 inches but Spokane frost depth requires minimum 30-inch footing embedment
Furnace heating capacity undersized for Spokane's Climate Zone 5B heating design temperature of negative 2 degrees F
Exterior receptacle outlet on north elevation missing required in-use weatherproof cover for Spokane freeze conditions
Exterior hose bib lacks freeze-proof sillcock valve required for Spokane's prolonged sub-freezing winter temperatures
Spokane wildland-urban interface hillside lot missing required Class A roof covering and ember-resistant soffit vents
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
How do Spokane's building requirements differ from western Washington?
Spokane is in Climate Zone 5B with higher snow loads, deeper frost lines, and greater heating demands than the west side. Foundation depths, insulation values, and HVAC sizing all reflect eastern Washington's continental climate with temperature extremes.
What snow load does Spokane require for roof design?
Spokane requires a minimum ground snow load of 32 psf for structural roof design. Drifting, sliding, and unbalanced snow load conditions must also be analyzed, and higher values may apply at elevated sites or areas with local drift accumulation.
Does Spokane have wildfire risk building requirements?
Yes. Properties in Spokane's wildland-urban interface zones must comply with ignition-resistant construction standards including Class A roof coverings, ember-resistant vents, and defensible space clearing requirements enforced through the International Wildland-Urban Interface Code.
What energy code applies to construction in Spokane?
Spokane enforces the Washington State Energy Code for Climate Zone 5B. This requires higher insulation R-values than western Washington, tighter air sealing, high-efficiency heating equipment, and window U-factor ratings suitable for cold climate performance.
How long does a Spokane building permit review take?
Spokane residential reviews typically take two to four weeks. Commercial projects may take four to six weeks depending on scope. CodeBuddy provides a pre-submittal review in 24 hours for $250 to catch issues before you submit to Spokane.