Kent, Washington
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Kent.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Kent enforces the Washington State Building Code with emphasis on Cascadia subduction zone seismic design and the Green River Valley's liquefaction-prone soils. The city's large warehouse and industrial district triggers specific structural and fire requirements. CodeBuddy reviews your Kent plans for $250 with 24-hour turnaround, covering seismic detailing, flood plain compliance, and Washington energy code requirements.
Prepared for Acme Mechanical Inc.
Location
Kent, WA
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Kent, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Warehouse slab-on-grade design omits required liquefaction mitigation for Kent Valley alluvial soil conditions
High-piled storage rack arrangement exceeds 25-foot height without required in-rack sprinkler system per IFC Chapter 32
Green River flood plain project missing required one-foot freeboard above base flood elevation per Kent Municipal Code
Warehouse unit heater placement conflicts with required clearance to combustible high-piled storage per IMC
Industrial service entrance grounding electrode system missing supplemental ground rod for Kent Valley soil resistivity
Warehouse floor drain pitch insufficient to handle Kent's stormwater infiltration requirements at grade-level loading docks
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What codes does Kent enforce for warehouse and industrial construction?
Kent adopts the Washington State Building Code including IBC, IFC, IMC, UPC, and NEC. Warehouse and industrial projects must also meet high-piled storage requirements, enhanced fire suppression standards, and the city's critical areas ordinance for flood-prone parcels.
Are there special soil considerations for building in Kent?
Yes. Much of Kent sits in the Green River Valley on alluvial soils prone to liquefaction during seismic events. Geotechnical reports are typically required, and foundations may need deep piles, ground improvement, or structural slabs designed for differential settlement.
Does Kent have flood zone requirements?
Kent has extensive FEMA-mapped flood zones along the Green River. Projects in these areas must meet elevation requirements, provide one-foot freeboard above base flood elevation, and use flood-resistant materials below the design flood level.
How long does Kent's plan review process take?
Kent residential reviews typically take two to three weeks. Commercial and industrial reviews run four to eight weeks depending on complexity. CodeBuddy delivers a pre-submittal review in 24 hours for $250 to reduce correction cycles.
What energy code requirements apply to new buildings in Kent?
Kent enforces the Washington State Energy Code, which is among the most stringent in the nation. Commercial buildings must meet envelope, lighting, and mechanical efficiency standards. Residential projects follow prescriptive or performance paths for insulation and air sealing.