Dayton, Ohio
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Dayton.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Dayton Inspection Readiness Report is a one-time $250 review with 24-hour turnaround. Send your jobsite photos and tracking list for a specialist review against Ohio Building Code and Dayton's local requirements. Dayton sits in one of Ohio's most tornado-active corridors, as the 2019 Memorial Day outbreak demonstrated, and inspectors pay close attention to wind resistance connections, roof tie-downs, and storm shelter compliance.
Prepared for Acme Mechanical Inc.
Location
Dayton, OH
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Dayton, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof-to-wall hurricane clips missing on gable-end truss connections in new construction within Dayton's high-wind zone
Whole-house surge protector not installed at main panel on rebuild of tornado-damaged home per updated local guidance
Water service line material is polybutylene which Dayton requires replacement upon change of ownership or major renovation
Rooftop HVAC unit on light commercial building lacks seismic and wind restraint brackets per manufacturer installation manual
Garage-to-living-space conversion missing required fire separation wall between new habitable room and remaining garage bay
Storm shelter in new Dayton subdivision lacks required signage and illuminated exit path per Ohio amendment
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does the report address Dayton's wind and tornado resistance requirements?
Yes. Dayton's location in a tornado-prone corridor means inspectors focus on roof-to-wall connections, gable-end bracing, garage door wind ratings, and storm shelter compliance. The report evaluates all structural wind resistance items against Ohio Building Code requirements.
What are Dayton's most common inspection fail items?
Missing hurricane tie-down clips, inadequate attic ventilation, electrical grounding deficiencies in older homes, and fire separation violations in garage conversions are among the most frequent Dayton inspection failures. Polybutylene water line replacement is also flagged.
How does proximity to Wright-Patterson AFB affect building permits in Dayton?
Projects near Wright-Patterson Air Force Base may face height restrictions, noise attenuation requirements, and airspace clearance reviews. The report notes if your project location falls within the base influence zone and flags applicable construction requirements.
What code cycle does Dayton currently enforce?
Dayton follows the Ohio Building Code, based on the 2017 ICC codes with state amendments. The city enforces additional local requirements around wind resistance and stormwater management. Post-tornado rebuilds may also be subject to updated construction standards.
Can I use the report for post-tornado rebuild work in Dayton?
Yes. The report is well-suited for tornado rebuild projects. It checks structural connections, wind resistance detailing, updated material requirements, and any code changes that apply when rebuilding a substantially damaged structure in Dayton or Montgomery County.