Trenton, New Jersey
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Trenton.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Trenton enforces the NJ Uniform Construction Code (NJAC 5:23) as the state capital, where government building renovations, Delaware River flood zones, and urban redevelopment define the construction environment. The city's aging infrastructure and older housing stock require careful attention to structural assessments and utility upgrades. Code Buddy's Inspection Readiness Report costs $250 with 24-hour turnaround, identifying Trenton-specific issues like Delaware River floodplain compliance and accessibility upgrades in historic government-adjacent buildings.
Prepared for Acme Mechanical Inc.
Location
Trenton, NJ
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Trenton, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Delaware River floodplain substantial improvement calculation exceeds 50% threshold triggering full flood compliance upgrade
Government building renovation ADA accessibility path of travel not extended to include public restrooms and parking
Aging terra cotta sewer lateral not scoped or replaced during major renovation of pre-1940 commercial building
Service entrance conductors routed through non-fire-rated chase in mixed-use downtown redevelopment project
Assembly occupancy in renovated downtown storefront missing required second means of egress for occupant load over 49
Rooftop condensing unit on historic district building visible from street without required screening per Trenton zoning
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
How do Delaware River flood zones affect building permits in Trenton?
Trenton has FEMA-mapped flood zones along the Delaware River. The report verifies flood elevation certificates, substantial improvement calculations, and flood-proofing requirements that can delay permits if not addressed upfront.
Does the report cover accessibility requirements for Trenton government buildings?
Yes. Renovations to government and public-access buildings in Trenton must meet current ADA and NJ Barrier Free Sub-Code standards. The report checks paths of travel, restroom accessibility, signage, and parking compliance.
What is the price and turnaround for the Inspection Readiness Report?
The report is $250 with 24-hour delivery. It reviews your project documentation against the NJ Uniform Construction Code and Trenton-specific flood, zoning, and redevelopment area requirements.
Can the report help with downtown Trenton redevelopment projects?
Yes. Trenton's urban redevelopment zones have overlay requirements affecting facade treatments, parking, and use restrictions. The report checks that your plans comply with both base code and applicable redevelopment plan standards.
Are older infrastructure issues flagged for Trenton renovation projects?
The report identifies aging utility connections, deteriorated sewer laterals, undersized electrical services, and structural concerns common in Trenton's pre-war building stock that code officials will scrutinize during inspection.
Also in New Jersey