Edison, New Jersey
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Edison.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Edison Township enforces the NJ Uniform Construction Code (NJAC 5:23) through its Building Department, with licensed code officials reviewing all permit applications. The suburban Middlesex County municipality sees significant pharmaceutical and biotech lab buildouts alongside residential development. Code Buddy's Inspection Readiness Report costs $250 with 24-hour turnaround, flagging Edison-specific issues like radon mitigation in slab-on-grade construction and freeze-thaw damage to exterior masonry common in central New Jersey.
Prepared for Acme Mechanical Inc.
Location
Edison, NJ
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Edison, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Pharmaceutical lab panel schedule missing dedicated circuits for fume hood exhaust fans required by NJAC 5:23
Radon mitigation sub-slab depressurization piping not extended through roof per NJ radon code requirements
Freeze-thaw spalling on exterior CMU foundation wall not addressed before new siding installation
Make-up air unit for cleanroom lacks required balancing dampers and pressure monitoring per mechanical code
Sprinkler head spacing exceeds 130 sq ft maximum coverage in open-plan office conversion area
Egress window well dimensions in basement bedroom conversion do not meet 5.7 sq ft minimum opening
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What codes does Edison Township enforce for building inspections?
Edison enforces the NJ Uniform Construction Code under NJAC 5:23, which covers building, electrical, plumbing, fire protection, and mechanical sub-codes. All inspections are conducted by licensed code officials employed by the township.
Does the report cover radon mitigation requirements in Edison?
Yes. Middlesex County is designated a moderate-to-high radon zone, and the report checks that sub-slab depressurization systems, vapor barriers, and vent piping meet NJ Department of Environmental Protection radon standards.
How quickly will I receive my Inspection Readiness Report?
Reports are delivered within 24 hours of uploading your plans and documents. The $250 flat fee covers a full review against current NJ Uniform Construction Code requirements applicable to your Edison project.
Can the report identify issues specific to pharmaceutical or lab buildouts?
Yes. Edison's large pharmaceutical sector means the report checks specialized ventilation, chemical waste plumbing, electrical panel requirements for lab equipment, and occupancy classification for hazardous material storage areas.
Does the report address freeze-thaw damage concerns for Edison properties?
The report flags exterior masonry, foundation, and flatwork conditions susceptible to central New Jersey's freeze-thaw cycling. It identifies areas where water infiltration or inadequate drainage could cause inspection failures.
Also in New Jersey