Paterson, New Jersey
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Paterson.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Paterson enforces the NJ Uniform Construction Code (NJAC 5:23) in a city shaped by historic mill architecture, Passaic River flood hazards, and dense older housing stock. Work near the Great Falls National Historical Park triggers additional historic preservation review. Code Buddy's Inspection Readiness Report costs $250 with 24-hour turnaround, catching Paterson-specific issues like historic district facade requirements, flood damage repair compliance, and outdated electrical systems in century-old multi-family buildings.
Prepared for Acme Mechanical Inc.
Location
Paterson, NJ
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Paterson, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Historic mill building facade alteration lacks State Historic Preservation Office consultation required within Great Falls district
Passaic River flood-damaged floor joists in basement not evaluated by licensed engineer before repair permit issuance
Fuse panels in 1920s multi-family dwelling not upgraded to circuit breakers during gut renovation as required
Galvanized supply piping in pre-war housing showing interior corrosion buildup not replaced during kitchen renovation scope
Three-family dwelling missing interconnected smoke and CO detectors on every habitable floor per NJAC 5:70
Replacement boiler flue liner not extended to chimney top in 100-year-old building with deteriorated clay flue tiles
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does the report address historic preservation requirements in Paterson?
Yes. Projects within or adjacent to the Great Falls National Historical Park and Paterson's local historic districts require State Historic Preservation Office review. The report identifies when your project triggers these additional approvals.
How does Passaic River flooding affect Paterson building permits?
Paterson has extensive FEMA-mapped flood zones along the Passaic River. The report checks that flood elevation certificates, flood-proofing details, and substantial improvement calculations are included in your permit package.
What is the cost and delivery time for the report?
The Inspection Readiness Report costs $250 and is delivered within 24 hours. It reviews your plans and documentation against the NJ Uniform Construction Code and Paterson-specific historic, flood, and housing requirements.
Can the report catch electrical issues in Paterson's older housing stock?
Yes. Many Paterson homes still have original fuse panels, knob-and-tube wiring, and undersized service entrances. The report flags electrical deficiencies that must be corrected during renovation under current NJ electrical sub-code.
Are multi-family dwelling requirements covered for Paterson projects?
The report checks fire separation between dwelling units, smoke and CO detector placement per NJAC 5:70, egress window compliance, and means of egress requirements specific to Paterson's dense multi-family housing conversions.
Also in New Jersey