Peoria, Illinois
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Peoria.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Peoria Inspection Readiness Report is a one-time $250 service with 24-hour turnaround. Send your project photos and tracking list to receive findings before the inspector arrives. Peoria's older housing stock and river bluff terrain mean inspectors frequently encounter foundation settlement, aging utility connections, and renovation projects that must blend new code requirements with existing non-conforming construction.
Prepared for Acme Mechanical Inc.
Location
Peoria, IL
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Peoria, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Foundation wall crack exceeds 1/4-inch width with horizontal displacement indicating active lateral soil pressure from bluff-side backfill
Renovation project ties new 15-amp AFCI circuit into existing ungrounded knob-and-tube wiring at junction box splice
Galvanized steel water supply line transition to copper lacks required dielectric union, creating galvanic corrosion potential at joint
Replacement furnace installed in alcove with insufficient combustion air opening, providing only 60 square inches instead of required 100
Vinyl replacement window in bedroom fails egress requirements with net clear opening height of 22 inches instead of required 24 inches
Hardwired smoke detector in renovated hallway not interconnected with existing battery units in adjacent bedrooms per NFPA 72
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
How does Peoria handle code compliance on older home renovations?
Peoria applies current code to new work while allowing existing non-conforming elements to remain unless the renovation scope triggers a full compliance upgrade. The readiness report identifies which standards apply to your specific renovation scope.
What foundation issues are common in Peoria inspections?
Peoria's river bluff terrain and expansive clay soils cause lateral pressure on basement walls. Inspectors check for horizontal cracking, wall bowing, and inadequate drainage. Foundation issues on bluff-side properties are among the most cited Peoria findings.
How do I order a Peoria readiness report?
Upload your project photos and tracking list through the platform. The report costs $250 one-time and is delivered within 24 hours. It covers all trades visible in your photos and is tailored to Peoria's specific code requirements.
Are old wiring systems flagged during Peoria electrical inspections?
Yes. When renovation work connects to existing knob-and-tube or ungrounded wiring, Peoria inspectors verify proper transition methods, AFCI protection requirements, and grounding provisions. Improper splices between old and new wiring are a frequent failure.
Does the Peoria report cover Caterpillar manufacturing facility work?
Yes. The report covers industrial and manufacturing projects common in the Peoria area. This includes machine foundation requirements, heavy electrical service installations, ventilation for welding and fabrication areas, and fire suppression system details.
Also in Illinois