Solar & Renewable · Peoria, Illinois
Solar & Renewable inspection readiness
for Peoria.
Send us photos of your solar & renewable work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
PV arrays, rapid shutdown, inverters, racking, fire setbacks, and NEC 690/705 compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your solar & renewable work in Peoria, Illinois against the codes and specs that apply. Send photos of pv arrays, rapid shutdown, inverters, racking, fire setbacks, and nec 690/705 compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about solar & renewable inspections in Peoria
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
solar inspection requirements in Peoria?
solar panel installation inspection in Peoria?
PV system inspection checklist in Peoria?
rapid shutdown inspection prep in Peoria?
solar permit inspection requirements in Peoria?
Three steps. Five minutes.
Submit your solar & renewable job, and our patent-pending AI reviews every photo against the standards that apply in Peoria.
Tell us about your solar & renewable job.
Project name, address in Peoria, and scope. We look up the applicable standards automatically.
Send photos of your solar & renewable work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging solar & renewable deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Solar & Renewable findings we help catch in Peoria.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Renovation project ties new 15-amp AFCI circuit into existing ungrounded knob-and-tube wiring at junction box splice
Galvanized steel water supply line transition to copper lacks required dielectric union, creating galvanic corrosion potential at joint
Replacement furnace installed in alcove with insufficient combustion air opening, providing only 60 square inches instead of required 100
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR SOLAR & RENEWABLE REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.