Denver, Colorado
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Denver.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report for Denver covers the city's amended building codes, solar installation requirements, and energy efficiency standards at mile-high elevation. For $250, we review your photos and tracking list within 24 hours, flagging issues before Denver Building Department inspectors visit. Denver's green building ordinance and local amendments add layers beyond base state code.
Prepared for Acme Mechanical Inc.
Location
Denver, CO
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Denver, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Solar panel rapid shutdown device not installed within one foot of array as required by Denver amended NEC
Condensate drain from high-efficiency furnace not routed to approved disposal point per Denver plumbing amendment
Anchor bolt spacing at mudsill exceeds six-foot maximum required for Denver seismic provisions
Tankless water heater venting uses improper category III vent material instead of required stainless steel
Basement rim joist insulation missing at band board, creating thermal bypass in Denver energy code assembly
Residential fire sprinkler coverage gap in finished basement exceeds maximum spacing for light hazard design
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What Denver-specific code items does the report check?
Denver adopts local amendments to the IBC, IRC, NEC, and energy code. We check solar rapid shutdown, green building provisions, altitude-adjusted equipment, and Denver-specific fire sprinkler triggers.
How much does the Denver Inspection Readiness Report cost?
The report is $250, one time. Submit photos and your tracking list, and receive written findings within 24 hours depending on availability. No ongoing subscription fees apply.
Does Denver require residential fire sprinklers?
Denver has specific triggers for residential fire sprinkler systems in new construction. Our report reviews sprinkler coverage, head spacing, and supply adequacy where visible in your submitted photos.
Can this help avoid Denver inspection delays?
Yes. Failed inspections in Denver can delay your project by days or weeks during busy seasons. Our pre-inspection review catches common deficiencies so your team can correct them before scheduling.
Do you check solar installation requirements?
Yes. Denver's solar ordinance and NEC amendments require specific rapid shutdown, conduit routing, and labeling. We verify these items are visible and compliant in your photos before your electrical inspection.
Also in Colorado