Aurora, Colorado
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Aurora.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report for Aurora reviews hail-resistant roofing details, high-altitude HVAC sizing, and energy code compliance for the Front Range corridor. For $250, we examine your photos and tracking list within 24 hours, catching deficiencies before Aurora Building Department inspectors do. Colorado's intense UV exposure and severe hailstorms demand durable exterior assemblies.
Prepared for Acme Mechanical Inc.
Location
Aurora, CO
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Aurora, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof covering not rated Class 4 impact resistance, required in Aurora for hail-prone Front Range exposure
HVAC equipment not derated for 5,400-foot altitude, reducing heating output below design load requirements
Solar panel conduit penetrations through roof deck lack proper flashing and sealant for UV stability
Exterior irrigation backflow preventer installed without drain-down valve for freeze protection
Deck post bases not elevated above grade with standoff hardware to prevent moisture wicking and rot
Window flashing tape not extending over housewrap in shingle fashion at sill pan detail
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What does the Aurora Inspection Readiness Report cover?
We review structural, mechanical, electrical, plumbing, and envelope items against Aurora's adopted codes. Special attention goes to altitude derating, hail resistance, and energy envelope requirements common to Front Range construction.
Why does altitude matter for Aurora inspections?
Aurora sits above 5,400 feet. HVAC equipment must be derated for thinner air, gas appliances need high-altitude orifices, and UV exposure accelerates material degradation. Our report flags altitude-related oversights.
How fast do I get results?
We deliver written findings within 24 hours of receiving your photos and tracking list, depending on availability. The one-time cost is $250 with no subscription required.
Do you check for hail damage requirements in Aurora?
Yes. Aurora's location on the Front Range makes hail-rated materials important. We verify roof covering impact ratings, siding fastening, and protective details that inspectors commonly flag.
Is this a substitute for my Aurora building inspection?
No. This is a pre-inspection review to help your team correct deficiencies before the official Aurora Building Department visit, reducing failed inspections and schedule delays.
Also in Colorado