Boulder, Colorado
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Boulder.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report for Boulder addresses the city's strict green building and energy conservation requirements alongside wildfire-urban interface defensible space standards. For $250, we review your photos and tracking list within 24 hours, identifying deficiencies before Boulder's inspection team does. Boulder enforces some of Colorado's most aggressive sustainability and solar-ready mandates.
Prepared for Acme Mechanical Inc.
Location
Boulder, CO
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Boulder, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Wall assembly air leakage rate exceeds Boulder's enhanced energy code threshold based on visible penetration sealing gaps
Furnace flue clearance to combustible framing less than required one-inch minimum in attic penetration
Solar-ready conduit pathway from electrical panel to roof not installed per Boulder solar-ready ordinance
Deck ledger connection using lag screws instead of through-bolts required for Boulder's adopted IRC provisions
Water heater expansion tank missing on closed-loop domestic system with pressure-reducing valve
Vegetation clearance zone around structure does not meet Boulder wildfire defensible space setback requirements
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does the Boulder report address green building requirements?
Yes. Boulder enforces enhanced energy conservation and solar-ready mandates beyond base state code. Our report checks insulation values, air sealing, solar-ready conduit, and EV-ready provisions specific to Boulder ordinances.
What about wildfire defensible space in Boulder?
Properties in Boulder's wildland-urban interface must meet defensible space clearances. We review visible vegetation setbacks, exterior material ratings, and vent screening that inspectors examine during site visits.
How much does the Boulder Inspection Readiness Report cost?
The report is a one-time $250 fee. Submit your photos and tracking list, and receive written findings within 24 hours depending on availability. No recurring charges.
Can I use this for a renovation in Boulder?
Yes. Boulder renovations trigger current code compliance for altered areas. We review your submitted documentation against applicable requirements and flag items likely to cause inspection corrections.
What trades does the report cover?
We review structural, mechanical, electrical, plumbing, envelope, and fire protection items. Each finding includes trade, description, and severity so your crew knows exactly what to address.
Also in Colorado