Mobile, Alabama
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Mobile.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Mobile contractors can get a written Inspection Readiness Report for $250 with results delivered within 24 hours. Submit your photos and tracking list before your inspection, and receive documented findings addressing the wind-load, flood-zone, and humidity-driven code requirements that Mobile's Gulf Coast location demands for both residential and commercial construction projects.
Prepared for Acme Mechanical Inc.
Location
Mobile, AL
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Mobile, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Hurricane strap connector nailing pattern incomplete at roof-to-wall connection per Mobile's 140 mph wind speed design requirement
Electrical panel in flood-prone Mobile garage mounted below required base flood elevation without weatherproof enclosure
HVAC condenser unit pad elevation below base flood elevation in Mobile flood zone A per local floodplain ordinance
Exterior hose bibb lacks required vacuum breaker backflow prevention device per IPC 608.15
Mold-susceptible faced fiberglass insulation used in Mobile coastal crawlspace instead of closed-cell or unfaced product
Roof sheathing attachment uses 6d nails instead of 8d ring-shank nails required in Mobile's high-wind zone
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What makes a Mobile Inspection Readiness Report different from other cities?
Mobile's Gulf Coast location means inspectors enforce strict wind-load ratings, flood elevation requirements, and moisture management standards. The report specifically checks for hurricane strap installation, flood zone compliance, and humidity-related material choices that Mobile inspectors prioritize.
How does the $250 report help with Mobile's hurricane code requirements?
The report reviews your photos for proper hurricane connector installation, roof sheathing nailing patterns, impact-rated openings, and other wind-resistance details required in Mobile's 140 mph design wind speed zone. Catching these before inspection avoids costly rework.
Does the report cover flood zone compliance in Mobile?
Yes. Mobile has extensive FEMA flood zones, and the report checks equipment elevation, electrical panel placement, and foundation details against your property's flood zone designation and Mobile's local floodplain management ordinance requirements.
How fast do I receive the findings?
You receive the written report within 24 hours of submitting your photos and tracking list. For Mobile contractors with inspections scheduled the next day, this gives you a window to address any findings before the inspector arrives on site.
What types of Mobile projects does this cover?
The report covers residential, commercial, and maritime-adjacent construction in Mobile. Whether you are building waterfront condos on the causeway, warehouse space near the port, or suburban homes in west Mobile, the review addresses your project's specific code exposure.
Also in Alabama