Arlington, Virginia
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Arlington.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Arlington County enforces the Virginia Uniform Statewide Building Code with rigorous plan review for the dense Rosslyn-Ballston corridor's high-rise and mixed-use projects. Code Buddy's Inspection Readiness Report costs $250 with 24-hour turnaround. Reports address Arlington's site plan requirements, Metro-adjacent construction staging constraints, and the structural and fire protection complexities common in the county's vertical development projects.
Prepared for Acme Mechanical Inc.
Location
Arlington, VA
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Arlington, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Post-tensioned slab pour card missing engineer-of-record sign-off required by Arlington for high-rise concrete frame per USBC Section 1705
Standpipe system in Rosslyn corridor mixed-use tower lacks required fire department connection signage per NFPA 14 and Arlington amendments
EV charging conduit rough-in in parking garage does not meet Arlington's capacity requirements for new multifamily construction
Rooftop air handling unit on mid-rise near Metro lacks vibration isolation per Arlington noise ordinance for transit-adjacent residential
Grease interceptor sizing for ground-floor restaurant in mixed-use building undersized per Arlington plumbing requirements
Continuous insulation at curtain wall spandrel panel missing thermal break detail required by IECC 2018 commercial provisions
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does the report address Arlington's site plan review requirements?
Yes. For projects subject to Arlington's site plan process, the report flags construction details that commonly cause inspection holds, including stormwater management, tree preservation, and public infrastructure tie-ins required by the county.
What are common inspection failures in Arlington's high-rise corridor?
Frequent issues include incomplete fire-rated assembly documentation, missing structural special inspection reports, inadequate firestopping at floor penetrations, and EV charging infrastructure that does not meet Arlington's current capacity mandates.
How does Arlington handle energy code enforcement?
Arlington enforces IECC 2018 through the USBC. Commercial projects face strict envelope testing and mechanical commissioning requirements. The report checks insulation continuity, air barrier details, and HVAC efficiency documentation.
Can I use the report for Arlington County permit submissions?
The report is designed for pre-inspection preparation, not permit application. However, the findings help resolve plan review comments and reduce the number of inspection trips needed to achieve final approval in Arlington.
What does the $250 report include for an Arlington project?
You receive a trade-by-trade analysis of your plans against USBC requirements and Arlington's local enforcement patterns within 24 hours. The report identifies likely inspection failures and references specific code sections.