Alexandria, Virginia

Find what your
punch list missed.

Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.

— any industry with field inspections in Alexandria.

$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.

Alexandria enforces the Virginia Uniform Statewide Building Code with additional oversight from the Board of Architectural Review for projects in Old Town and other historic districts. Code Buddy's Inspection Readiness Report costs $250 and is delivered within 24 hours. Reports flag conflicts with Alexandria's historic preservation overlay requirements, Potomac River floodplain regulations, and Chesapeake Bay Preservation Act compliance before your inspector arrives.

Trusted by teams at

Layton ConstructionBell ConstructionIPSPraetorian Power

Three steps. Five minutes.

Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.

1

Tell us about the job.

Project name, address in Alexandria, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.

Applicable standards pulled automatically from the project address
Upload your own specs or submittals for even tighter checking
2

Send your photos and open items.

Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.

Photos encrypted in transit and at rest — never shared or sold
3

Our patent-pending technology and AI system analyze every photo.

Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.

Hundreds of inspections completed across all major trades
Every finding is reviewed by a QA professional before delivery
4

Get your report within 24 hours*.

Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.

24-hour turnaround (business days)
Nothing new found? You pay $0 and keep the report

Built by Code Buddy.

Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.

Built for the people who actually do the work.

17+

Industries supported

24 hrs*

Report turnaround

$0

If nothing new identified

The kind of things we help catch.

Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.

Structural·Will fail inspection

Header beam in Old Town rowhouse renovation lacks engineered design per USBC Section 2308 for load-bearing wall removal

Electrical·Code violation

Exterior receptacle on Potomac-facing facade missing weather-resistant cover rated for flood zone exposure per NEC 406.9

Plumbing·Will fail inspection

Backflow preventer not installed on irrigation system within Chesapeake Bay Preservation Act resource protection area

Mechanical·Rework before cover

Condensing unit placement on historic district property violates Alexandria BAR setback and screening requirements

Fire Protection·Safety violation

Townhouse party wall firestopping at plumbing penetration incomplete per USBC Section 714 separation requirements

Insulation·QA flag

Spray foam insulation in attic of pre-1940 structure applied without required thermal barrier per USBC Section 2603.4

Only $250, one time.

And only if we identify something that wasn't already on your list.

If everything identified was already on your list, you pay nothing. You keep the report either way.

GET STARTED

Limited spots each week.

Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.

Before you ask.

Does the report cover Alexandria's Board of Architectural Review requirements?

The report identifies where your construction plans may conflict with BAR guidelines for Alexandria's historic districts, including material choices, window proportions, and facade treatments that commonly trigger review delays.

How does Alexandria handle Chesapeake Bay Preservation Act compliance for new construction?

Alexandria enforces CBPA resource protection area buffers and impervious surface limits. The report flags grading, stormwater, and site disturbance issues that would require additional environmental review before building permits are released.

What code does Alexandria follow for residential renovations?

Alexandria follows the Virginia Uniform Statewide Building Code based on 2018 IBC and IRC. Renovations in historic districts may also require BAR approval, and the report checks both building code and overlay requirements.

Are flood zone requirements included in the report?

Yes. Properties near the Potomac River waterfront or in mapped FEMA flood zones receive additional review for elevation certificates, flood-resistant materials, and mechanical equipment placement above base flood elevation.

How quickly can I get a report for an Alexandria project?

Reports are delivered within 24 hours of submission for $250. Upload your plans and permit documents, and the report identifies likely inspection failures specific to Alexandria's enforcement patterns and local requirements.

One job in Alexandria. Report within 24 hours*.
Nothing new, no charge.