Harris County, Texas
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Harris County.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report covers projects in Harris County for a flat $250 with results delivered within 24 hours. Upload your site photos and open items list, and our specialists review against adopted codes with attention to the humidity-driven corrosion, wind uplift, and expansive clay soil conditions that define construction across the greater Houston metro area.
Prepared for Acme Mechanical Inc.
Location
Harris County, TX
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Harris County, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Outdoor disconnect lacks weatherproof in-use cover rated for Harris County's hot-humid exposure
Steel beam flange shows surface corrosion from humidity exposure before fireproofing applied
Cleanout cap missing at building drain where it exits slab on expansive clay soil
Condensate drain on rooftop unit not piped to approved discharge point per local amendment
Sprinkler head spacing exceeds maximum for high-pile storage classification in warehouse bay
Wind uplift fastener pattern at roof edge does not match engineered schedule for 130 mph zone
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Harris County require separate permits for mechanical and plumbing work?
Yes, Harris County typically issues trade-specific permits. Our $250 Inspection Readiness Report flags which trades in your photos may need separate permit coverage before the inspector arrives.
How does the hot-humid climate in Harris County affect what you look for?
We specifically check for corrosion protection, condensate management, and vapor barrier continuity. Gulf Coast humidity causes issues that inland reviewers miss. Results within 24 hours.
Can you review photos from a petrochemical facility expansion?
Yes. Many of our Harris County reports cover industrial and energy sector projects. We review against applicable building codes, though process-specific OSHA or API standards are outside scope.
What if my project spans Harris County and a city jurisdiction?
Upload everything together. Our report notes which findings apply to county versus city code. The $250 flat fee covers the full review regardless of overlapping jurisdictions.
How many photos should I include in my submission?
We recommend 20 to 50 photos covering each open item. More is better. Our specialists can process large photo sets and still deliver your findings report within 24 hours.