Solar & Renewable · Scranton, Pennsylvania
Solar & Renewable inspection readiness
for Scranton.
Send us photos of your solar & renewable work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
PV arrays, rapid shutdown, inverters, racking, fire setbacks, and NEC 690/705 compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your solar & renewable work in Scranton, Pennsylvania against the codes and specs that apply. Send photos of pv arrays, rapid shutdown, inverters, racking, fire setbacks, and nec 690/705 compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about solar & renewable inspections in Scranton
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
solar inspection requirements in Scranton?
solar panel installation inspection in Scranton?
PV system inspection checklist in Scranton?
rapid shutdown inspection prep in Scranton?
solar permit inspection requirements in Scranton?
Three steps. Five minutes.
Submit your solar & renewable job, and our patent-pending AI reviews every photo against the standards that apply in Scranton.
Tell us about your solar & renewable job.
Project name, address in Scranton, and scope. We look up the applicable standards automatically.
Send photos of your solar & renewable work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging solar & renewable deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Solar & Renewable findings we help catch in Scranton.
Examples based on past reports — each includes the photo, location, and the reference checked against.
New construction in Scranton mine subsidence zone missing DEP mine subsidence insurance documentation and engineered foundation design
Floor joists in 1920s Lackawanna County wood-frame house sistered without matching original joist depth creating uneven bearing plane
Low-slope roof drainage design does not account for Scranton 40 psf ground snow load plus rain-on-snow surcharge per PA UCC
Wood-burning stove installation clearance to combustible wall at 30 inches does not meet 36-inch minimum without approved heat shield
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR SOLAR & RENEWABLE REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.