General Construction · Buffalo, New York
General Construction inspection readiness
for Buffalo.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Buffalo, New York against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Buffalo
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Buffalo?
construction inspection checklist in Buffalo?
what do building inspectors look for in Buffalo?
framing inspection prep in Buffalo?
final inspection checklist construction in Buffalo?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Buffalo.
Tell us about your general construction job.
Project name, address in Buffalo, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Buffalo.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Roof framing not designed for Buffalo's 90 psf ground snow load with required drift surcharge at parapet walls
Ice and water shield membrane extends only 12 inches past interior wall line where 24-inch minimum is needed for lake-effect zones
Exterior receptacle on converted industrial loft building lacks weatherproof while-in-use cover rated for wet location
Footing depth is 36 inches where Buffalo's frost depth requires minimum 48 inches below finished grade
Send us one general construction job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.