Fargo, North Dakota
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Fargo.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Fargo, North Dakota contractors can order an Inspection Readiness Report for $250 with 24-hour turnaround. Send your jobsite photos and tracking list to receive findings before the inspector visits. Fargo's Red River flood plain location and extreme winters with 60-inch frost depth create unique inspection requirements around foundation waterproofing and freeze protection.
Prepared for Acme Mechanical Inc.
Location
Fargo, ND
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Fargo, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Foundation waterproofing membrane not extended to full depth on exterior walls in Red River flood-prone area
Sump pump discharge line not routed to prevent re-entry and lacking check valve in high water table zone
Garage receptacle circuit missing GFCI protection where snow melt equipment and vehicle heaters are connected
HRV ductwork condensate drain not heated or insulated, creating freeze blockage risk in attic installation
Frost-protected shallow foundation heat loss calculation not provided with permit documents as required
Carbon monoxide detector missing in mechanical room with gas-fired boiler serving hydronic heating system
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What flood plain requirements does Fargo enforce?
Fargo has extensive FEMA-mapped flood zones along the Red River. Projects in these areas require elevated construction, flood-resistant foundation materials, and sump systems with backflow prevention. The city reviews elevation certificates and inspectors verify compliance at foundation stage.
Does Fargo require frost-protected shallow foundations?
Fargo allows frost-protected shallow foundations when engineered to ASCE 32 standards with proper heat loss calculations submitted at permit. Standard footings must reach 60-inch frost depth. Inspectors verify either full-depth footings or the approved frost-protection design before concrete placement.
What energy code does Fargo follow?
Fargo enforces the IECC for Climate Zone 7, which has the most stringent insulation and air sealing requirements in the continental United States. Continuous insulation, high-performance windows, and verified air barrier testing are standard inspection items on every project.
How does the $250 Inspection Readiness Report work for Fargo projects?
You upload jobsite photos and your tracking list. Within 24 hours you receive findings covering all trades, with emphasis on Fargo-specific items like flood plain compliance, frost depth verification, freeze protection on piping, and Climate Zone 7 energy envelope requirements.
What are the most common inspection failures in Fargo?
Insufficient frost depth on footings, missing foundation waterproofing in flood-prone areas, and energy code air sealing deficiencies are the top failures. HRV condensate drain freeze protection and sump pump installation details are also frequently flagged by Fargo inspectors.
Also in North Dakota