Kansas City, Missouri

Find what your
punch list missed.

Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.

— any industry with field inspections in Kansas City.

$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.

Kansas City, Missouri contractors can get an Inspection Readiness Report for $250 with 24-hour turnaround. Send your jobsite photos and tracking list, and receive findings before the inspector arrives. Kansas City enforces local amendments addressing tornado resistance, flood plain construction along the Missouri River, and seismic detailing that inspectors actively check.

Trusted by teams at

Layton ConstructionBell ConstructionIPSPraetorian Power

Three steps. Five minutes.

Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.

1

Tell us about the job.

Project name, address in Kansas City, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.

Applicable standards pulled automatically from the project address
Upload your own specs or submittals for even tighter checking
2

Send your photos and open items.

Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.

Photos encrypted in transit and at rest — never shared or sold
3

Our patent-pending technology and AI system analyze every photo.

Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.

Hundreds of inspections completed across all major trades
Every finding is reviewed by a QA professional before delivery
4

Get your report within 24 hours*.

Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.

24-hour turnaround (business days)
Nothing new found? You pay $0 and keep the report

Built by Code Buddy.

Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.

Built for the people who actually do the work.

17+

Industries supported

24 hrs*

Report turnaround

$0

If nothing new identified

The kind of things we help catch.

Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.

structural·critical

Continuous load path from roof to foundation incomplete, missing hold-down anchors at shear wall ends

electrical·critical

AFCI protection not provided for all required branch circuits in dwelling unit per 2018 NEC adoption

plumbing·major

Backwater valve missing on building sewer in flood-prone area near Missouri River as required locally

mechanical·major

Ductwork in unconditioned attic not sealed with mastic at joints, failing energy code requirements

fire-protection·critical

Sprinkler head coverage area exceeds maximum spacing in open floor plan commercial tenant build-out

building·minor

Handrail graspability profile exceeds 2-inch diameter limit at decorative newel transition section

Only $250, one time.

And only if we identify something that wasn't already on your list.

If everything identified was already on your list, you pay nothing. You keep the report either way.

GET STARTED

Limited spots each week.

Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.

Before you ask.

What code cycle is Kansas City currently on?

Kansas City adopts the IBC and IRC with local amendments. The city maintains its own amendment package that addresses wind loads, flood plain requirements, and energy efficiency. Contact the Kansas City Building Department to confirm the exact edition currently enforced for your permit.

Are there special requirements for building in Kansas City flood zones?

Yes. Properties in FEMA-mapped flood zones along the Missouri and Blue Rivers must meet elevated construction standards, including minimum finished floor elevations, backwater valves, and flood-resistant materials below the base flood elevation. These are commonly flagged items during inspections.

How does the $250 report help with Kansas City inspections?

The report identifies deficiencies across all trades before your official inspection. Kansas City inspectors are known to be thorough on load path connections, AFCI coverage, and energy code compliance. Catching these items in advance avoids failed inspections and rebooking delays.

What are the most common fail items in Kansas City?

Incomplete continuous load paths, missing AFCI protection on required circuits, and unsealed duct joints in unconditioned spaces are frequent failures. Flood zone projects also commonly fail for incorrect elevation certificates or missing backwater protection on sewer lines.

Does Kansas City require special tornado-resistant construction?

Kansas City enforces wind load requirements consistent with its tornado alley location. Roof-to-wall connections, garage door wind ratings, and continuous load paths from roof to foundation are actively inspected. Some occupancy types require storm shelter provisions under current local amendments.

One job in Kansas City. Report within 24 hours*.
Nothing new, no charge.