Solar & Renewable · Miami, Florida
Solar & Renewable inspection readiness
for Miami.
Send us photos of your solar & renewable work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
PV arrays, rapid shutdown, inverters, racking, fire setbacks, and NEC 690/705 compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your solar & renewable work in Miami, Florida against the codes and specs that apply. Send photos of pv arrays, rapid shutdown, inverters, racking, fire setbacks, and nec 690/705 compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about solar & renewable inspections in Miami
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
solar inspection requirements in Miami?
solar panel installation inspection in Miami?
PV system inspection checklist in Miami?
rapid shutdown inspection prep in Miami?
solar permit inspection requirements in Miami?
Three steps. Five minutes.
Submit your solar & renewable job, and our patent-pending AI reviews every photo against the standards that apply in Miami.
Tell us about your solar & renewable job.
Project name, address in Miami, and scope. We look up the applicable standards automatically.
Send photos of your solar & renewable work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging solar & renewable deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Solar & Renewable findings we help catch in Miami.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Concrete block wall reinforcement spacing exceeds 48 inches on center required for HVHZ construction per FBC 2113
Backflow preventer on irrigation tie-in not installed at grade as required by City of Miami plumbing amendments
Peel-and-stick underlayment not sealed at nail penetrations on re-roof in HVHZ wind zone per FBC 1522.4
Smoke detector in high-rise corridor mounted more than 12 inches from ceiling violating NFPA 72 spacing rules
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR SOLAR & RENEWABLE REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.