Wilmington, Delaware
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Wilmington.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Wilmington enforces Delaware's adopted IRC and IBC codes across Delaware's largest city, where aging rowhome stock and corporate office towers present distinct inspection challenges. CodeBuddy's Inspection Readiness Report costs $250 with 24-hour turnaround and addresses issues specific to Wilmington's Brandywine Creek flood zones, historic brownstone renovations, and high-rise commercial fit-outs in the banking and financial services district.
Prepared for Acme Mechanical Inc.
Location
Wilmington, DE
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Wilmington, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Party wall fire rating between attached rowhomes compromised by new HVAC penetration without listed firestop assembly in pre-1940 masonry construction
Combined sewer lateral in older Wilmington neighborhood requires backwater valve installation before connecting new basement bathroom fixtures
Service panel upgrade in historic brownstone lacks required working clearance due to original coal cellar stairway encroachment
Commercial kitchen exhaust duct in downtown restaurant fit-out missing listed grease duct enclosure where passing through tenant separation wall
Standpipe hose connection in high-rise office lobby positioned above 5-foot maximum height for Wilmington Fire Department access
Spray foam insulation on interior of stone foundation wall in Brandywine Village renovation traps moisture without capillary break per best practice
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What special requirements apply to rowhome renovations in Wilmington?
Wilmington's dense rowhome blocks require careful attention to party wall fire ratings, structural bearing on shared walls, and egress window clearances. Renovations that alter fire separation or add habitable space in basements trigger additional inspections for fire protection and means of egress.
How does Brandywine Creek flooding affect Wilmington building permits?
Projects near Brandywine Creek must comply with FEMA flood zone requirements including elevated first floors, flood-resistant materials below base flood elevation, and mechanical equipment raised above the 100-year flood level. Wilmington reviews floodplain development permits separately from building permits.
Does the Inspection Readiness Report cover Wilmington's historic district requirements?
The report focuses on building code compliance, not historic preservation review. However, it flags where code-required changes such as egress modifications or fire protection upgrades may conflict with historic fabric so you can coordinate with the Historic Preservation Commission early.
What is included in the $250 Inspection Readiness Report for Wilmington?
You receive a trade-by-trade plan review against Delaware's adopted codes within 24 hours. The report identifies likely inspection failures, missing permit details, and code conflicts specific to Wilmington's building stock and local enforcement patterns.
Are there additional fire code requirements for high-rise buildings in Wilmington?
Yes. Buildings over 75 feet in Wilmington require standpipes, fire command centers, emergency voice communication, and elevator recall systems. The fire marshal reviews these systems independently from the building department's structural and mechanical inspections.