Plumbing · New Haven, Connecticut
Plumbing inspection readiness
for New Haven.
Send us photos of your plumbing work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
DWV, water supply, gas piping, water heaters, fixtures, and IPC/UPC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your plumbing work in New Haven, Connecticut against the codes and specs that apply. Send photos of dwv, water supply, gas piping, water heaters, fixtures, and ipc/upc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about plumbing inspections in New Haven
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
plumbing inspection preparation in New Haven?
what do plumbing inspectors check in New Haven?
plumbing rough-in inspection checklist in New Haven?
water heater inspection requirements in New Haven?
DWV inspection prep in New Haven?
Three steps. Five minutes.
Submit your plumbing job, and our patent-pending AI reviews every photo against the standards that apply in New Haven.
Tell us about your plumbing job.
Project name, address in New Haven, and scope. We look up the applicable standards automatically.
Send photos of your plumbing work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging plumbing deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Plumbing findings we help catch in New Haven.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Replacement windows in New Haven historic district do not match approved muntin profile and will trigger Historic District Commission rejection
Ground-floor retail tenant fit-out in mixed-use building missing separate metering and disconnecting means per CT electrical code
Grease interceptor undersized for new restaurant occupancy in converted New Haven storefront based on fixture unit count and menu type
Assembly occupancy above ground-floor retail exceeds 300 persons but second exit stair width does not meet egress capacity requirements
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR PLUMBING REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.