Kenosha, Wisconsin
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Kenosha.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
The Inspection Readiness Report for Kenosha costs $250 one-time with 24-hour turnaround. Submit your project photos and tracking list and receive findings before the inspector arrives. Kenosha's position along the I-94 corridor between Milwaukee and Chicago has driven rapid commercial and residential development, and inspectors focus closely on stormwater management, Lake Michigan shoreline setbacks, and wind exposure ratings.
Prepared for Acme Mechanical Inc.
Location
Kenosha, WI
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Kenosha, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Shoreline setback foundation missing required helical pier anchoring for Lake Michigan erosion zone per Kenosha ordinance
Stormwater detention basin outlet pipe diameter undersized for the impervious surface area added by new I-94 corridor retail pad
Ground-fault protection on 480V feeder not provided for commercial building service exceeding 1000 amps
Makeup air unit for commercial kitchen exhaust hood lacks interlocked gas shutoff valve required by Wisconsin mechanical code
Window installation flashing membrane not lapped correctly over housewrap at sill creating moisture intrusion path
Exit sign illumination below minimum one foot-candle at floor level in corridor adjacent to parking structure
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
Does Kenosha have local amendments beyond the Wisconsin commercial building code?
Kenosha enforces the Wisconsin Commercial Building Code administered by the state Department of Safety and Professional Services, plus local ordinances covering stormwater management, shoreline setbacks along Lake Michigan, and zoning overlay requirements in the I-94 development corridor.
How does the rapid development along I-94 in Kenosha affect inspection availability?
The I-94 corridor development boom has increased permit volume in Kenosha. Inspection wait times can reach two to three business days during peak season. A readiness report helps you pass on the first visit rather than waiting for a reinspection slot.
What are common inspection failures for new residential construction in Kenosha?
Common Kenosha residential failures include missing sump pump discharge piping to daylight, inadequate attic ventilation ratios, improperly supported deck ledger boards, missing carbon monoxide detectors on each habitable level, and incorrect egress window sizing in bedrooms.
Are there special requirements for properties near the Lake Michigan shoreline in Kenosha?
Properties within Kenosha's shoreline overlay district face setback requirements, bluff erosion control provisions, and foundation design standards that account for wave action and soil instability. Inspectors verify compliance with both state shoreland zoning and local ordinances.
What is included in the $250 Inspection Readiness Report?
The $250 report provides findings across all relevant trades for your project within 24 hours. You upload photos and your inspection tracking list. The report identifies items that would likely trigger a failed inspection and references the applicable code sections.
Also in Wisconsin