Maritime & Vessel · Seattle, Washington
Maritime & Vessel inspection readiness
for Seattle.
Send us photos of your maritime & vessel work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Vessel safety equipment, hull condition, fire systems, navigation aids, and USCG/SOLAS compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your maritime & vessel work in Seattle, Washington against the codes and specs that apply. Send photos of vessel safety equipment, hull condition, fire systems, navigation aids, and uscg/solas compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about maritime & vessel inspections in Seattle
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for a port state control inspection in Seattle?
vessel inspection checklist in Seattle?
USCG inspection preparation in Seattle?
SOLAS compliance inspection prep in Seattle?
maritime safety inspection requirements in Seattle?
Three steps. Five minutes.
Submit your maritime & vessel job, and our patent-pending AI reviews every photo against the standards that apply in Seattle.
Tell us about your maritime & vessel job.
Project name, address in Seattle, and scope. We look up the applicable standards automatically.
Send photos of your maritime & vessel work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging maritime & vessel deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Maritime & Vessel findings we help catch in Seattle.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Mid-rise wood-frame podium lacks required Cascadia subduction zone drift limits at soft-story transition to concrete base
Combined sewer area connection detail missing required backwater valve per Seattle side sewer code provisions
Rooftop access stairway penthouse enclosure does not meet Seattle Fire Department aerial apparatus setback requirements
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR MARITIME & VESSEL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.