General Construction · Seattle, Washington
General Construction inspection readiness
for Seattle.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Seattle, Washington against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Seattle
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Seattle?
construction inspection checklist in Seattle?
what do building inspectors look for in Seattle?
framing inspection prep in Seattle?
final inspection checklist construction in Seattle?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Seattle.
Tell us about your general construction job.
Project name, address in Seattle, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Seattle.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Mid-rise wood-frame podium lacks required Cascadia subduction zone drift limits at soft-story transition to concrete base
Seattle energy code prohibits electric resistance heating as primary source in multifamily units over 500 sf
Seattle amendment requires solar-ready zone on roof but plans show no designated conduit pathway or panel space
Combined sewer area connection detail missing required backwater valve per Seattle side sewer code provisions
Rooftop access stairway penthouse enclosure does not meet Seattle Fire Department aerial apparatus setback requirements
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.