Plumbing · Travis County, Texas
Plumbing inspection readiness
for Travis County.
Send us photos of your plumbing work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
DWV, water supply, gas piping, water heaters, fixtures, and IPC/UPC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your plumbing work in Travis County, Texas against the codes and specs that apply. Send photos of dwv, water supply, gas piping, water heaters, fixtures, and ipc/upc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about plumbing inspections in Travis County
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
plumbing inspection preparation in Travis County?
what do plumbing inspectors check in Travis County?
plumbing rough-in inspection checklist in Travis County?
water heater inspection requirements in Travis County?
DWV inspection prep in Travis County?
Three steps. Five minutes.
Submit your plumbing job, and our patent-pending AI reviews every photo against the standards that apply in Travis County.
Tell us about your plumbing job.
Project name, address in Travis County, and scope. We look up the applicable standards automatically.
Send photos of your plumbing work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging plumbing deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Plumbing findings we help catch in Travis County.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Solar panel rapid shutdown device not installed within required distance of array per NEC 690.12
Deck ledger connection to house rim joist using lag screws instead of required through-bolts
Rainwater harvesting system missing required first-flush diverter before potable treatment unit
Defensible space vegetation clearance around new Hill Country residence does not meet 30-foot requirement
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR PLUMBING REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.