Electrical · Austin, Texas
Electrical inspection readiness
for Austin.
Send us photos of your electrical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Panels, wiring, conduit, grounding, AFCI/GFCI, service equipment, and NEC compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your electrical work in Austin, Texas against the codes and specs that apply. Send photos of panels, wiring, conduit, grounding, afci/gfci, service equipment, and nec compliance and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about electrical inspections in Austin
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for an electrical inspection in Austin?
electrical inspection checklist in Austin?
what do electrical inspectors look for in Austin?
pre-inspection review electrical in Austin?
electrical rough-in inspection prep in Austin?
Three steps. Five minutes.
Submit your electrical job, and our patent-pending AI reviews every photo against the standards that apply in Austin.
Tell us about your electrical job.
Project name, address in Austin, and scope. We look up the applicable standards automatically.
Send photos of your electrical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging electrical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Electrical findings we help catch in Austin.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Data center PDU whip circuit breaker sizing does not match submitted electrical load calculation schedule
Austin Energy green building compliance requires ERV on this occupancy type but only standard AHU installed
Cool roof coating SRI value not documented for flat roof assembly as required by Austin energy code
Send us one electrical job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE ELECTRICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.