Solar & Renewable · Pittsburgh, Pennsylvania
Solar & Renewable inspection readiness
for Pittsburgh.
Send us photos of your solar & renewable work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
PV arrays, rapid shutdown, inverters, racking, fire setbacks, and NEC 690/705 compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your solar & renewable work in Pittsburgh, Pennsylvania against the codes and specs that apply. Send photos of pv arrays, rapid shutdown, inverters, racking, fire setbacks, and nec 690/705 compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about solar & renewable inspections in Pittsburgh
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
solar inspection requirements in Pittsburgh?
solar panel installation inspection in Pittsburgh?
PV system inspection checklist in Pittsburgh?
rapid shutdown inspection prep in Pittsburgh?
solar permit inspection requirements in Pittsburgh?
Three steps. Five minutes.
Submit your solar & renewable job, and our patent-pending AI reviews every photo against the standards that apply in Pittsburgh.
Tell us about your solar & renewable job.
Project name, address in Pittsburgh, and scope. We look up the applicable standards automatically.
Send photos of your solar & renewable work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging solar & renewable deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Solar & Renewable findings we help catch in Pittsburgh.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Hillside building foundation design missing geotechnical report for slope stability on Pittsburgh terrain exceeding 25% grade
Radon mitigation system vent pipe termination less than 10 feet from operable window in adjacent Allegheny County property
Grading plan directs surface runoff toward neighboring downhill property without detention or approved discharge to Pittsburgh storm sewer
Furnace combustion air intake draws from attached garage without sealed separation violating IRC G2407 for Pittsburgh residential projects
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR SOLAR & RENEWABLE REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.