Solar & Renewable · Long Island, New York
Solar & Renewable inspection readiness
for Long Island.
Send us photos of your solar & renewable work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
PV arrays, rapid shutdown, inverters, racking, fire setbacks, and NEC 690/705 compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your solar & renewable work in Long Island, New York against the codes and specs that apply. Send photos of pv arrays, rapid shutdown, inverters, racking, fire setbacks, and nec 690/705 compliance and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about solar & renewable inspections in Long Island
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
solar inspection requirements in Long Island?
solar panel installation inspection in Long Island?
PV system inspection checklist in Long Island?
rapid shutdown inspection prep in Long Island?
solar permit inspection requirements in Long Island?
Three steps. Five minutes.
Submit your solar & renewable job, and our patent-pending AI reviews every photo against the standards that apply in Long Island.
Tell us about your solar & renewable job.
Project name, address in Long Island, and scope. We look up the applicable standards automatically.
Send photos of your solar & renewable work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging solar & renewable deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Solar & Renewable findings we help catch in Long Island.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Main electrical panel installed below base flood elevation in Long Island coastal flood zone without approved elevation plan
Roof sheathing nail pattern uses 6-inch spacing where 4-inch edge spacing is required for 120 mph coastal wind exposure
Crawl space vapor barrier terminates at grade beam without sealed overlap needed for high-moisture coastal conditions
Send us one solar & renewable job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE SOLAR & RENEWABLE REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.