Reno, Nevada
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Reno.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Reno enforces IBC/IRC with Nevada state amendments and Washoe County overlay requirements addressing seismic zone D considerations, heavy snow loads at higher elevations, and wildland-urban interface fire protection. The Truckee Meadows region demands dual climate design for freezing winters and hot summers. Plan reviews start at $250 with 24-hour turnaround for residential projects.
Prepared for Acme Mechanical Inc.
Location
Reno, NV
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Reno, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Roof framing not designed for Reno area ground snow load of 35 PSF minimum required at elevations above 4500 feet
Structure in wildland-urban interface zone missing required Class A fire-rated roofing and ember-resistant soffit vents
Furnace and AC system lacking dual-mode thermostat programming for Reno freeze-thaw cycling between day and night temperatures
Seismic hold-down anchor bolts at shear wall ends spaced beyond maximum allowed for seismic design category D
Exterior hose bib missing required freeze-proof valve body for installations in Reno climate zone 5B winter conditions
Ground-mounted solar panel racking foundation lacks frost depth footing required for Reno area 24-inch frost line
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What seismic requirements apply to building in Reno?
Reno falls in seismic design category D, requiring engineered lateral force resistance, hold-down anchors at shear walls, and special inspection for concrete and masonry. The Truckee Meadows sits on active fault lines making seismic compliance a primary focus of plan review.
How does Reno handle snow load requirements?
Reno requires minimum ground snow loads of 35 PSF for most valley locations, increasing at higher foothill elevations. Roof framing, truss designs, and drift calculations must account for local snowfall patterns and potential accumulation against parapets and adjacent structures.
What wildfire building requirements exist in Reno?
Properties in Reno's wildland-urban interface zones must use Class A fire-rated roofing, ember-resistant vents, non-combustible siding within five feet of the structure, and defensible space landscaping. The fire marshal reviews plans for WUI compliance before building permits are issued.
How much is a plan review in Reno?
Reno residential plan reviews start at $250 with 24-hour turnaround. The Building Department also processes over-the-counter permits for minor work like water heaters and electrical panel upgrades. Commercial reviews follow a tiered fee schedule based on project valuation.
Does Reno require freeze protection for plumbing?
Yes, all exterior and exposed plumbing in Reno must include freeze protection. This includes frost-proof hose bibs, insulated pipe runs in unconditioned spaces, and heat tape on vulnerable water supply lines. The 24-inch frost depth drives foundation and underground pipe burial requirements.
Also in Nevada