Plumbing · Hennepin County, Minnesota
Plumbing inspection readiness
for Hennepin County.
Send us photos of your plumbing work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
DWV, water supply, gas piping, water heaters, fixtures, and IPC/UPC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your plumbing work in Hennepin County, Minnesota against the codes and specs that apply. Send photos of dwv, water supply, gas piping, water heaters, fixtures, and ipc/upc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about plumbing inspections in Hennepin County
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
plumbing inspection preparation in Hennepin County?
what do plumbing inspectors check in Hennepin County?
plumbing rough-in inspection checklist in Hennepin County?
water heater inspection requirements in Hennepin County?
DWV inspection prep in Hennepin County?
Three steps. Five minutes.
Submit your plumbing job, and our patent-pending AI reviews every photo against the standards that apply in Hennepin County.
Tell us about your plumbing job.
Project name, address in Hennepin County, and scope. We look up the applicable standards automatically.
Send photos of your plumbing work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging plumbing deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Plumbing findings we help catch in Hennepin County.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Engineered truss bearing point not aligned with load path to foundation per approved framing plan
Sump pump discharge line terminating too close to foundation wall, causing re-infiltration concern
Fresh air intake for HRV system located within 10 feet of exhaust termination point
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR PLUMBING REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.