Electrical · Wayne County, Michigan
Electrical inspection readiness
for Wayne County.
Send us photos of your electrical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Panels, wiring, conduit, grounding, AFCI/GFCI, service equipment, and NEC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your electrical work in Wayne County, Michigan against the codes and specs that apply. Send photos of panels, wiring, conduit, grounding, afci/gfci, service equipment, and nec compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about electrical inspections in Wayne County
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for an electrical inspection in Wayne County?
electrical inspection checklist in Wayne County?
what do electrical inspectors look for in Wayne County?
pre-inspection review electrical in Wayne County?
electrical rough-in inspection prep in Wayne County?
Three steps. Five minutes.
Submit your electrical job, and our patent-pending AI reviews every photo against the standards that apply in Wayne County.
Tell us about your electrical job.
Project name, address in Wayne County, and scope. We look up the applicable standards automatically.
Send photos of your electrical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging electrical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Electrical findings we help catch in Wayne County.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Environmental phase assessment documentation not available for commercial-to-residential conversion on former industrial parcel
Outdoor receptacle on dwelling unit missing weather-resistant and tamper-resistant rated device
Backwater valve not installed on building sewer where subject to sewage backup in Wayne County flood zone
Rooftop HVAC unit curb flashing not integrated with roof membrane causing moisture infiltration path
Fire sprinkler head coverage obstructed by ductwork installed after sprinkler layout was approved
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR ELECTRICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.